Similar Projects
Valley Springs Middle School Mechanical Upgrade
Bidding
Arden, NC 28704

Removal and Replacement of Two (2) Hot Water Heaters
Bidding
Wilmington, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

J--Chiller Inspection and Maintenance
Post-Bid
Asheville, NC 28805

Steam Distribution System Replacement Phase IV-A
Results
Less than $2,000,000 est. value
Greensboro, NC

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

Boiler Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Boiler Replacement in Killian Building
Results
Less than $61,890 est. value
Flat Rock, NC

Upgrade Chiller Plant Fort Bragg, NC
Post-Bid
Fort Bragg, NC 28307

Ultrasoft Water Softener Unit
Results
Camp Lejeune, NC 28547

Hope Mills Library Boiler Replacement
Post-Bid
Hope Mills, NC 28348

Northern Wake Campus Exterior Hydronic Piping and Equipment Addition
Results
Raleigh, NC

Blue Ridge Community College Spearman Building Boiler 1 Replacement
Post-Bid
Flat Rock, NC 28731

North Buncombe Elementary School Boiler Replacement
Results
Less than $74,367 est. value
Weaverville, NC 28787

Reverse Osmosis System for 30 Locations
Post-Bid
NC

Last Updated 11/10/2020 10:21 AM
Project Title

Mechanical, Electrical, & Plumbing MACC

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC 28547   (Onslow County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $240,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacing (2) two existing 350hp boilers and associated deaerator, replacing 3 steam to hot water heat exchangers and associated pumps, air seperators and expansion tanks, replace (183) cooling only VAV boxes with new vav boxes with hot water reheat coils and adding new steam to hot water heat exchange and pumping skid to provide hot water for replaced VAV boxes. This project will also include removing existing hot water reheat coils that were attached to a perimeter heating loop that did not have proper controls to support them. All replaced and new equipment will be tied into the existing DDC system per the Camp Lejeune Metasys requirements utilizing N+1 format for the boilers, pumps and other equipment. The (3) three pair of existing pumps that are being replaced with the heat exchages share VFD's. Each pump will have a VFD and the controls shall lead lag the pumps.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents