Similar Projects
Dowden Court Wastewater Improvements
Infrastructure
Bidding
$850,000 est. value
Charleston, SC

Check Valve Installation Project - SCPA Union Pier Terminal
Infrastructure
Bidding
Charleston, SC 29401

On-Call Pavement Maintenance and Repair
Term Contract, Infrastructure
Post-Bid
James Island, SC

Construction of US 17 to Rifle Range Road Connector
Infrastructure
Post-Bid
Mount Pleasant, SC

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Trolley Barn Parking Lot
Results
$450,000 to $600,000 est. value
Charleston, SC 29403

Road Work - Bethel AME Church Left Turn Lane on US-17 Savannah Highway Project CTC
Infrastructure
Post-Bid
SC

Full Depth Patching-District 6
Results

Full Depth Patch-District 6
Infrastructure
Post-Bid

Intersection Improvements - S-732
Results

Crack Seal-District 6
Infrastructure
Post-Bid

FY20 Resurfacing North Charleston
Results
North Charleston, SC

Crack Seal - District 6
Term Contract
Results

Preservation - Berkely/Charleston Co
Results

Rehabilitation- Charleston Co
Results
SC

Reported 04/27/2022 12:00 AM
Project Title

Road Work - Slidel Street Paving Project CTC

Physical Address View project details and contacts
City, State (County) SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project, located in in Charleston County in the Town of Lincolnville, involves asphalt paving an existing unpaved road approximately 440 feet in length on Slidel Street from the West Smith Street intersection to the Pickens Street intersection. The work shall also include, but is not limited to, the installation of sewer caps, paving asphalt driveways, and stop bars, as well as erosion and sediment control and traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents