Similar Projects
Hawthorne Park Tennis Court Improvement
Bidding
Teaneck, NJ

NJSEA DeKorte Facilities Landscape Maintenance, Snow Removal and Ice Watch Services
Term Contract
Post-Bid
Lyndhurst, NJ 07071

Planting of Shade Trees
Term Contract
Post-Bid
Glen Rock, NJ 07452

Roller Hockey Rink Improvements
Results
Oakland, NJ 07436

Woodside Park and Dairy Field Park Improvements
Results
Midland Park, NJ 07432

The River Club
New Construction - 8,000 SF
Construction
$100,000,000 est. value
Bogota, NJ 07603

Safety Pruning of Trees - Various Streets
Post-Bid
Teaneck, NJ 07666

Columbus and Grantwood Parks Improvements
Results
Cliffside Park, NJ 07010

2020 Tree Pruning and Removal
Post-Bid
Englewood Cliffs, NJ 07632

Sports Fields Upgrade at Alexander Hamilton Elementary School
Results
Glen Rock, NJ 07452

Kiddie Academy
Renovation - 9,350 SF
Post-Bid
Rutherford, NJ 07070

Memorial Field and Gardner Field Basketball Court Renovations
Results
Washington Township, NJ 07676

Russell Farms Community Park Improvements
Post-Bid
Wyckoff, NJ 07481

Carver Park Tennis Court Rehabilitation
Results
Hackensack, NJ 07601

Improvements to Memorial Town Hall Field
Post-Bid
Wyckoff, NJ 07481

Last Updated 07/31/2020 10:20 AM
Project Title

Kings Pond Park Development Phase II

Physical Address View project details and contacts
City, State (County) Ridgewood, NJ 07450   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Principal items of the work of the project include: provide and install approximately 6,000 S.Y. Topsoil with Hydro-seeding cover, 4 inches thick; Construction of approximately 200 L.F. 9-inch by 18-inch Concrete Vertical Curb; Planting of approximately 50 Trees; Planting of approximately 500 Containerized Plants; Installation of approximately 2,000 Plugs/Tubes Plants; provide and install approximately 220 C.Y. Hard Wood Mulch; provide and install approximately 110 Tons 6-inch diameter Rip-Rap; provide and install approximately 140 C.Y. specified Bio-Retention Soil; provide and install approximately 800 S.Y. Stone Dust Walking Path with Aluminum Edging; provide and install 6 Park Benches; and all other related work for a complete the project at Kings Pond Park.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Mulching, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents