Similar Projects
Last Updated | 07/31/2020 10:20 AM |
Project Title | Kings Pond Park Development Phase II |
Physical Address | View project details and contacts |
City, State (County) | Ridgewood, NJ 07450 (Bergen County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Landscaping, Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Principal items of the work of the project include: provide and install approximately 6,000 S.Y. Topsoil with Hydro-seeding cover, 4 inches thick; Construction of approximately 200 L.F. 9-inch by 18-inch Concrete Vertical Curb; Planting of approximately 50 Trees; Planting of approximately 500 Containerized Plants; Installation of approximately 2,000 Plugs/Tubes Plants; provide and install approximately 220 C.Y. Hard Wood Mulch; provide and install approximately 110 Tons 6-inch diameter Rip-Rap; provide and install approximately 140 C.Y. specified Bio-Retention Soil; provide and install approximately 800 S.Y. Stone Dust Walking Path with Aluminum Edging; provide and install 6 Park Benches; and all other related work for a complete the project at Kings Pond Park. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |