Similar Projects
Bishop School Roof Replacement - Town of Arlington
Alteration
Conception
$1,600,000 est. value
Arlington, MA 02474

Roof Replacement at the DPW Building
Renovation - 32,000 SF
Bidding
$420,000 CJ est. value
Somerville, MA 02145

45 Pelham Street roof replacement
Renovation
Bidding
$50,000 CJ est. value
Newton, MA 02459

Malden Housing Authority Roof Replacement Project
Renovation
Sub-Bidding
$750,000 CJ est. value
Malden, MA 02148

Photovoltaic System for Woburn Fire Headquarters
Renovation
Sub-Bidding
$350,000 CJ est. value
Woburn, MA 01801

Preparation and Install New Roof
Alteration
Post-Bid
$36,361 est. value
Lowell, MA

Shannon Beach Restroom Facilities - Sub-Bids
Alteration
Post-Bid
$2,050,694 est. value
Winchester, MA 01890

Replacement of Roof at HC Solomon Mental Health Center
Alteration
Results
$730,000 est. value
Lowell, MA 01854

Bridge Elementary School Roof Replacement
Alteration
Results
Lexington, MA 02421

Replacement of Roof A Systems on the Saunders Building - General Bid
Alteration
Post-Bid
$2,000,000 est. value
Tewksbury, MA

Roof Repairs for Various Municipal Buildings
Alteration
Results
$100,000 est. value
Wakefield, MA

Arch Street Roof Replacement Project
Alteration
Post-Bid
$220,000 est. value
Lowell, MA 01851

Roof Repairs and Snow Clearing Services for Various City Building Rooftops
Alteration
Results
$150,000 est. value
Cambridge, MA

Replacement of Roof A Systems on the Saunders Building - Sub Bid
Alteration
Post-Bid
$2,000,000 est. value
Tewksbury, MA

Weston High School Wing F Roof Replacement - General Bid
Alteration
Results
$1,175,000 est. value
Weston, MA 02493

Last Updated 07/12/2023 06:08 PM
Project Title

Miller-Placentino Roof Repairs

Physical Address View project details and contacts
City, State (County) Holliston, MA 01746   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Holliston Facilities, the Awarding Authority, invites sealed bids from contractors for the Miller-Placentino School Roof Repairs in in Holliston, MA, in accordance with the documents prepared by Gorman Richardson Lewis Architects. Remove and replace approximately 55,000 Square Feet of architectural asphalt shingled roof and underlayment and replace with in-kind materials. Question Deadline 06/27/2023 at 5:00 PM ET The Project consists of but not limited to: 1. Removal of existing asphalt shingles and underlayment, and installation of new asphalt shingles and underlayment. 2. Installation of new gutter liner in existing gutter system. 3. Removal of existing penetration (exhaust fans, HVAC ducts, and pipe penetrations) and flashings, and installation of new penetration flashings.

Details

55,000 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents