Last Updated 06/20/2019 02:44 PM
Project Title

2019 Full Depth Reclamation and Plant Mix Resurfacing on Various Sub-division Streets and County Roads, Shoulder Paving, Shoulder Reconstruction and Grassing

Physical Address View project details and contacts
City, State (County) GA   (Coweta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Full Depth Reclamation and Plant Mix Resurfacing on Various Sub-division Streets and County Roads, at a total length of 17.887 miles. The Major Items of Work Consist of: 1. Traffic Control: 2. Cement Stabilized Reclaimed Base Construction (FDR): 238,456 square yards: 3. Recycled Asphalt Concrete 19MM, 12.5MM, and Bituminous Tack: 39,174 total tons 4. Selective Shoulder Paving inside curves 5. Grading Complete (Shoulder and Slope Construction, and Mail Box Grading) 6. Grassing, Stabilization of Newly Constructed Shoulders 7. Thermoplastic Striping and Raised Pavement Marker placement
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents