Similar Projects
Crack Sealing Contract
Infrastructure
Conception
$4,300,000 CJ est. value
N Merrick, NY 11566

I 495 Pavement Rehab Ex 32 to 48
Infrastructure
Conception
$35,000,000 CJ est. value
Old Westbury, NY 11568

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

WSP at Old Country Rd Ramp Impvt
Infrastructure
Design
$4,150,000 CJ est. value
Carle Place, NY 11514

Long Beach WPCP Consolidation Pump Station Conversion
Renovation, Infrastructure
Bidding
$33,387,700 CJ est. value
Long Beach, NY 11561

RFP Construction Manager - Cedar Creek WPCP Secondary Treatment Improvements Project
Renovation, Infrastructure
Bidding
$40,000,000 CJ est. value
Seaford, NY 11783

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Clean Fill Removal Services
Alteration
Post-Bid
Elmont, NY 11003

JOC Order Contracting Region A
Results
$10,000,000 est. value

Job Order Contracting - Regions 2B, 3A, 3B, 4A, 4B, 5 and 6
Results
$2,000,000 to $10,000,000 est. value

Glen Cove Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Glen Cove, NY 11542

St. Michael's Home Assisted Living Facility
New Construction, Infrastructure - 90,000 SF
Pending Verification
$25,000,000 CJ est. value
Uniondale, NY 11553

NY 107 Over I495 Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Massapequa, NY 11758

AutoZone #6872 / Westbury
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Westbury, NY 11590

Building Additions and Interior Alterations Rebid at Uniondale High School - Contract G3 General Construction Work (Interior Alterations)
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,563,098 CJ est. value
Uniondale, NY 11553

Last Updated 11/21/2022 02:13 PM
Project Title

Drexel Avenue Station - AOP Treatment and Office Renovation and Addition - Plumbing Construction

Physical Address View project details and contacts
City, State (County) Westbury, NY 11590   (Nassau County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 29, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** his project consists of three separate contracts for compliance with Wicks Law and generally consists of the construction of a new advanced oxidation process and granular activated carbon facility including a building enclosure and new piping, valves, chemical treatment, standby generators, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing wells and boosters at the site, power, controls, SCADA, all wiring and devices, site paving and restoration, and other utility work as shown and called for in conformance with the Contract Documents. Additionally, the work includes the renovation of existing and addition of new office space and associated mechanical and electrical work as shown and called for in conformance with the Contract Documents. Each Bid must be accompanied by a certified or bank cashier's check made payable to OWNER, or a Bid Bond issued by a surety licensed to conduct business in the state where the Project is located and having a Best Rating of A- or better from A.M. Best Company and named in the current list of "Companies Holding Certificates of Authority as Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury, in an amount not less than five percent of the amount of the Bid submitted. The list may be ordered from the Government Printing Office Bookstore, 26 Federal Plaza, Room 110, New York, NY 10278, (212) 264-3825. Each Bidder must complete and submit with their bid the "Iranian Investment Activities Certification" provided in the Bid Form in compliance with General Municipal Law 103-g, Iranian Energy Sector Divestment. Each Bidder must complete and submit with their Bid the "Certification of Compliance with New York State Labor Law Section Two Hundred One-G" provided in the Bid Form regarding the implementation of a written policy addressing sexual harassment prevention in the workplace. The Bidder to whom the OWNER proposes to award the Contract will be required to furnish performance and payment bonds and the necessary insurance certificates as prescribed in the General Conditions and the Supplementary Conditions upon the execution of the Agreement within ten (10) days of the Notice of Award. Bidders are required to execute a non-collusive bidding certification required by Section 103-d of the General Municipal Law of the State of New York. The attention of Bidders is particularly called to the requirements as to the conditions of employment to be observed and the minimum wage rates to be paid under the contracts. Bidders are also required to comply with the anti-discrimination provisions of Sections 290-301 of the Executive Law of the State of New York. The OWNER reserves the right to reject any or all of the Bids received, to readvertise for Bids, to abandon the project, to waive any or all informalities in any Bid received and to accept any proposal which the OWNER decides to be for the best interest of the OWNER. All questions must be submitted, in writing, to Frank Merklin no later than 4:00 p.m. on Wednesday, June 1 2022. Questions must be sent via email to fmerklin@dbeng.com. The Work to be done under this Contract and in accordance with these Specifications and Drawings consists of furnishing of plant equipment, superintendents, labor, skill, material and all other items necessary for the construction of the Drexel Avenue Station AOP Treatment and Office Renovation & Addition. The Contractors shall perform all Work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use. B. The Work to be done under this Contract shall be the responsibility of three (3) Prime Contractors, a General Contractor, an Electrical Contractor, and a Plumbing Contractor, each skilled in the work described within the designated Divisions. The Prime Contractors may subcontract such work as requires mechanics other than those normally employed, but the entire responsibility for complete performance of the Contract shall remain with the Prime Contractors. C. The Prime Contractors shall coordinate and communicate with each other through verbal and written communication, as may be necessary to facilitate the progress of construction to conform to the project schedule and term as defined in the agreement. Communication shall include transmittal of approved shop drawings that contain information relevant to other trades and contracts, weekly updates to progress schedules, telephone communication to support the expedited completion of work, delivery of pipe sleeves, embedded equipment and coordination of masonry openings, and other means as necessary. D. Whenever used in these Contract Documents, the term "Engineer" shall refer to the firm of D&B Engineers and Architects, D.P.C., acting directly, or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them. The work to be completed under three contracts, Contract 2022-2 - General, 2022-3 - Electrical, and 2022-4 - Plumbing, includes, but may not be limited to, demolition of the existing garage building structure and foundations and all associated mechanical, HVAC and electrical equipment including hazardous materials abatement, demolition of one (1) natural gas fired emergency generator and one (1) diesel fired emergency generator, replacement of the packed tower treatment system transfer and booster pumps, replacement of the packed tower treatment system blowers, replacement of the Well 6 pump motor starter, replacement of the existing Well 7A pump and motor, construction of the proposed AOP and GAC treatment buildings, furnishing and installing an AOP and GAC treatment system and process equipment, piping, installation of instrumentation, equipment and control systems, ventilation equipment, SCADA improvements, security and alarm systems, electrical power and lighting systems, natural gas service improvements and heating system, installation of new stand-by power systems and equipment, installation of PSEG transformer, removal of an existing diesel storage tank and all accessories and appurtenances, as hown on the Contract Drawings, specified herein and as required for a complete installation. B. The work also includes demolition of existing administration areas including hazardous materials abatement and the renovation of these existing administration areas.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents