Similar Projects
ADA Compliance Sidewalk Upgrades at Various Locations
Infrastructure
Bidding
$500,000 to $1,000,000 est. value

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Bidding
$2,500,000 est. value

Construction of Wor-Wic Applied Technology Building
New Construction - 52,000 SF
Post-Bid
Less than $30,566,000 est. value
Salisbury, MD 21804

Construction of Wor-Wic Applied Technology Building
New Construction - 52,000 SF
Post-Bid
Less than $30,566,000 est. value
Salisbury, MD 21804

Curb and Gutter Replacement
Results
Fruitland, MD 21826

SBY Airport Storm Drain Repairs
Term Contract
Results
Salisbury, MD 21804

US 1 (Washington Blvd) at Four Locations Between Prince George's County Line and Doctor Patel Drive Sidewalks - Howard County
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

2021 CDBG Church Street Doverdale Sidewalk Construction and ADA Upgrades
Results
Salisbury, MD 21801

North Parking Lot Resurfacing
Term Contract
Bidding
Salisbury, MD 21804

IDIQ Contract for Enhanced Grouting
Results
Laurel, MD

Transmission Main Replacement and Repair Services
Term Contract
Results
Laurel, MD

Install Concrete Sidewalk at Lower Eastern Shore Children`s Center
Results
Less than $50,000 est. value
Salisbury, MD 21801

Fair Hill NRMA Phase 4 Paving
Results
Less than $50,000 est. value
Elkton, MD 21921

City Wide Concrete Repair and Placement
Infrastructure
Results
Less than $225,000 est. value
Salisbury, MD

Curb and Gutter Replacement
Infrastructure
Results
Fruitland, MD

Last Updated 01/21/2022 11:32 AM
Project Title

Waterside Park Parking and Stormwater

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21801   (Wicomico County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,260
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a twenty five (25) space parking lot, new drive way entrance, and storm water management infiltration basin at Waterside Park located at Fitzwater Drive and Parsons Road.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents