Similar Projects
Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Mottman Industrial Park Building B Renovation
Renovation
Conception
$300,000 est. value
Tumwater, WA 98512

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

Craft District 2 Apartments
New Construction, Infrastructure
Bidding
$36,200,000 CJ est. value
Tumwater, WA 98501

Craft District 2 Apartments
New Construction, Infrastructure
Bidding
$36,200,000 CJ est. value
Tumwater, WA 98501

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SouthWest Mosman Avenue Phase Two
Infrastructure
Results
$1,150,000 to $1,270,000 est. value
Yelm, WA 98597

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

South Sound Commerce Center
New Construction, Infrastructure - 449,000 SF
Conception
$241,100,000 CJ est. value
Tumwater, WA 98501

Last Updated 01/04/2023 11:06 AM
Project Title

AJB Small Caves

Physical Address View project details and contacts
City, State (County) Olympia, WA 98502   (Thurston County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $960,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a warehouse development. As of January 4, 2022, site plans will be going for review on Wednesday, January 11th. A building permit has not been applied for. A construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

8,900 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents