Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

2020 Downtown Street and Utility Improvements
Infrastructure
Results
Perry, IA

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

The Iowa Clinic / Waukee
New Construction, Infrastructure - 40,000 SF
Construction
$23,000,000 CJ est. value
Waukee, IA 50263

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

James Pointe Plat 3 Lot 1 (Troy Plex)
New Construction, Infrastructure - 46,800 SF
Design
$5,000,000 CJ est. value
Waukee, IA 50263

New Hope Church Phase III
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Adel, IA 50003

Waukee Schools 2022 Playground Improvements
Infrastructure
Results
$1,059,745 CJ est. value
Waukee, IA 50263

Last Updated 06/19/2023 11:31 AM
Project Title

Transite Water Main Replacement - Phase 3

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $703,688 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Transite Water Main Replacement - Phase 3 including all labor, materials, and equipment necessary for approximately 3,530 linear feet of 8-inch water main primarily directional bored in place, hydrants, valves, fittings, connections to the existing system, service reconnections, surface restoration and miscellaneous associated work, including cleanup. The Transite Water Main Replacement - Phase 3 will be located along segments of Northview Drive, Kaylin Drive and Denlee Drive. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of ten percent (10%) of the bid. The successful bidder will be required to furnish bonds in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by responsible surety approved by the City Council and listed in the U.S. Treasury Department's most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee (1) the faithful performance of the contract and the terms and conditions therein contained, (2) the prompt payment to all persons, firms, subcontractors and corporations furnishing materials for or performing labor in the prosecution of the work, and (3) the maintenance of improvements in good repair for not less than four (4) years from the time of acceptance of the improvements by the City. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed and shall be completed by May 31, 2024. The duration of the work is critical to the project so as to minimize the disruption associated with the project to the public. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day The City Council reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the City. Questions regarding meeting format may also be directed to the City Clerkis office at 515-978-7904.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents