Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

Chiller Replacement For Boys And Girls Club - Rogers Street Academy
Alteration
Bidding
$300,000 est. value
Milwaukee, WI 53204

Engineering - Fire Stations 52 and 53 Sleeping Quarters Renovation
Renovation, Infrastructure
Bidding
$600,000 est. value
Wauwatosa, WI 53226

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Aquatics Facilities Study
Alteration
Bidding
Milwaukee, WI

Hubbard Park Parking Lot Design Engineering
Post-Bid
Shorewood, WI 53211

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Condition Assessment of Passenger Boarding Bridges and Baggage Handling Systems
Alteration
Bidding
Wauwatosa, WI

(Mac) For Architect-Engineer (AE) Services For Design and Engineering Services for Medical Design Projects, Predominantly for Medical Sustainment, Remediation, and Modernization
Post-Bid
$500,000 to $249,000,000 est. value

W Layton Ave (CTH Y) Reconstruction
Results
Greenfield, WI 53220

Engineering - Oklahoma Avenue Metropolitan Interceptor Sewer Capacity Improvements
Infrastructure
Bidding
$10,528,500 est. value
Milwaukee, WI 53207

Reported 06/16/2022 12:00 AM
Project Title

Engineering - IH 41 Zoo Freeway

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53274   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes IH 41 from Burleigh to Silver Spring Dr in Milwaukee County. The purpose is to rehabilitate existing deteriorated pavement and bridges and add auxiliary lanes along the corridor. Bridge Rehabilitation to be done on 13 bridges within the corridor. 1100-20-70 This Project ID includes mill and resurfacing the existing pavement from Burleigh St. to Capitol Dr. Base patching will be done where pavement needs. The UPRR bridge will be widened to accommodate the added auxiliary lane between Burleigh and Capitol. 1100-20-71 This Project ID includes mill and resurfacing the existing pavement from Capitol Dr. to Silver Spring Dr. Base patching will be done where pavement needs. Noise walls to be constructed on either side of IH 41 the length of the corridor. Consultant will provide Project Leader, Office/Materials Engineer, Structures Lead, Traffic Engineer, Roadway Lead, Electrical Lead, and up to 8 support staff. Consultant support staff includes general inspection as well as PWL testing, Bridge Coating Inspection, and Survey as needed. Full staffing is anticipated in the Spring of 2023 through fall of 2023. Reduced hours and/or staffing during winter 2023-2024 should be anticipated with a slight increase in Spring 2024. Functional leaders will not always have staff available and are expected to routinely perform active inspection to cover contractor operations.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents