Similar Projects
Distribution Center
Demolition - 182,000 SF
Conception
Mebane, NC 27302

Morosani Jumbo Storage III
New Construction - 231,250 SF
Conception
$10,000,000 CJ est. value
Arden, NC 28704

MANNA Foodbank
New Construction, Addition - 100,000 SF
Design
$3,000,000 est. value
Asheville, NC 28805

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 86,000 SF
Design
$25,000,000 CJ est. value
Asheville, NC 28801

Anson Middle School - New School
New Construction, Infrastructure - 160,000 SF
Bidding
$52,688,803 CJ est. value
Wadesboro, NC 28170

Cook Out / Burlington - Rebid
New Construction, Infrastructure - 3,088 SF
Bidding
$480,000 CJ est. value
Burlington, NC 27215

Ash - Waccamaw Multiuse Building - Brunswick County
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Ash, NC 28420

Army Reserve Center, Vehicle Maintenance Shop, and an Unheated Storage Building
New Construction - 37,405 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Asheville, NC

New Equipment Storage Facility
New Construction - 42,196 SF
Results
$2,500,000 to $3,000,000 est. value
Asheville, NC

Restore Maintenance Shed Oak Crest
Renovation
Results
Washington, NC 27889

Medline Industries Distribution Center
New Construction - 1,200,000 SF
Construction
$65,300,000 est. value
Mebane, NC

GKN Automotive
Renovation - 24,000 SF
Construction
Mebane, NC 27302

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Sardis Road Apartments
New Construction, Infrastructure
Pending Verification
$112,000,000 CJ est. value
Asheville, NC 28806

FY24 Garage And Warehouse Improvements - Buncombe County
Renovation
Conception
$920,000 est. value
Asheville, NC 28806

Last Updated 11/30/2022 10:55 AM
Project Title

Currituck Public Works Maintenance Building

Physical Address View project details and contacts
City, State (County) Maple, NC 27956   (Currituck County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of site work and construction of a 6,000 SF pre- engineered metal building. As of November 30, 2022, a general contractor has been selected. All subcontract trades have been let and set. Construction is anticipated to start first quarter 2023.

Details

6,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents