Similar Projects
The Yard at Brookhaven
New Construction - 119,260 SF
Conception
Orlando, FL

AdventHealth Mixed-Use Campus - Master Plan
New Construction
Conception
Orlando, FL 32832

Bainbridge Universal Sandlake Apartments
New Construction - 13,700 SF
Design
$100,000,000 est. value
Orlando, FL 32819

Bainbridge Apartments Master Plan
New Construction
Design
Orlando, FL 32819

The Brian D. Jellison Cancer Institute, Cancer Pavilion Phase 3 - General Contracting
New Construction - 200,000 SF
Bidding
$10,000,000 CJ est. value
Sarasota, FL 34239

Hamlin South West Medical Office Building D
New Construction - 15,200 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Winter Garden, FL

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Orlando Health Physics Lab Garage and Covered Parking
New Construction
Results
$187,105 est. value
Orlando, FL 32800

Expand Primary Care Design - Lake Nona, Orlando VAMC
Addition - 7,900 SF
Results
Orlando, FL 32827

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Retail and Dental Office - Shell
New Construction - 5,100 SF
Construction
$650,000 est. value
Winter Garden, FL 34777

New Fran Carlton Center
New Construction
Pending Verification
$2,500,000 est. value
Apopka, FL

UCF Basketball Excellence Center
Renovation
Conception
$15,000,000 est. value
Orlando, FL 32816

Student Housing Complex
New Construction
Design
Orlando, FL 32826

Daryl Carter Apartments
New Construction
Post-Bid
Orlando, FL

Last Updated 04/26/2022 09:44 AM
Project Title

AdventHealth Training Center

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Entertainment/Recreation, Heavy and Highway, Medical
Sub-Category(s) Athletic Facility, Medical Office/Outpatient, Parking Garage
Contracting Method
Project Status Construction Commenced October 2020, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $45,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Facility includes a healthcare component for community services and sports medicine. Building will include two basketball courts, a gym, food service, aquatic areas, and team health components, under-building parking garage.

Details

135,000 SF - Athletic Facility, 100,000 SF New Construction, Medical Office/Outpatient, 2 Stories Above Grade, 35,000 SF New Construction, New Construction, Parking Spaces, Parking Garage, New Construction, 3.78 Acres.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents