Similar Projects
IDIQ MACC For Mechanical, Electrical, Plumbing, and Fire Protection Projects at Naval Station Great Lakes and NOSCS within the AOR of a 450-Mile Radius of Naval Station Great Lakes
Renovation
Design
$25,000 to $750,000 est. value

183 CES Recruiting Office Upgrade/Move
Renovation - 1,100 SF
Design
$25,000 to $100,000 est. value
Springfield, IL 62702

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Bidding
$1,500,000 est. value

Restore Interior and Exterior and Upgrade Elevators
Renovation
Bidding
$9,000,000 est. value
Springfield, IL 62701

A/E Services for Construct Library Learning Student Success Center - Commissioning Services
New Construction - 65,000 SF
Post-Bid
Less than $35,000,000 est. value
Springfield, IL

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

IDOT District 6 Office
Renovation
Construction
Less than $10,000,000 est. value
Springfield, IL 62703

ERSC MATOC
Post-Bid
$100,000 to $90,000,000 est. value

Mid-West Regional Construction IDIQ MATOC
Results
$50,000 to $80,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Repair Multipurpose Arena and Grandstands
Renovation
Results
Less than $8,000,000 est. value
Springfield, IL 62702

South Carolina Construction IDIQ
New Construction, Renovation, Addition
Post-Bid
$250,000 to $3,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Last Updated 02/18/2021 12:00 AM
Project Title

Central Computing Facility

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Government/Public, Green Building
Sub-Category(s) LEED Certified, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $80,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services provides for LEED Enhanced Commissioning Services (design and reviews, construction/field inspection and start-up, functional performance testing, including O & M training and warranty review) for the construction of a Tier III Central Computer Facility to be located in the Springfield area. A minimum of LEED Silver Certification will be required. The Commissioning Agent (CxA) will work with the Bridging Firm during program analysis and throughout the development of the bridging documents, including assistance that may be necessary during preparation of the Request for Proposals (RFP) for the Design-Build Team. Major design features will include the following elements: Design Considerations: Evaluate transition of existing building and data equipment for potential reuse at the new facility. Evaluate available property, including state-owned property and propose a site. Give consideration to the application of renewable energy sources, including but not limited to, the use of solar energy. The scope of services also provides for the facilitation of documentation required for LEED Silver Certification. The CxA will facilitate and monitor completeness and timeliness of LEED submittals during project design phase, construction, close-out and extended warranty period. The CxA will maintain all documentation required for submittal to successfully meet the requirements of LEED Silver Certification process by the USGBC following completion of design and construction. This includes all USGBC certification fees and USGBC documents required during design, bidding, construction and project close-out. The CxA must have documented commissioning process experience on at least two building projects with a similar scope of work. The experience must extend from early design phase through at least 10 months of occupancy. It should be noted that the firm selected for Commissioning Services and any associated consultants cannot be a part of the Bridging Team and will not be allowed to be a member of the Design-Build Team.

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents