Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Drainage Ditch Correction
Infrastructure
Conception
$528,000 CJ est. value
Paoli, IN 47454

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Holton Storm Shelter Rebid
New Construction, Infrastructure - 2,336 SF
Design
$649,222 CJ est. value
Holton, IN 47023

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

2022 Taxiway Microsurface Project
Infrastructure
Design
$500,000 CJ est. value
Valparaiso, IN 46383

New Bridge Tipton / Park Street over RR crossing
Infrastructure, Renovation
Conception
$6,098,880 CJ est. value
La Porte, IN 46350

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$1,960,284 CJ est. value
Anderson, IN 46012

Chessie Trail Phase II - City of La Porte
Infrastructure
Conception
$500,000 est. value
La Porte, IN

New Albany Police Station / New Albany
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
New Albany, IN 47150

2019/20 Low Point Drainage (Top O Hollow, 28th, and Kennedy) - City of Ames
Infrastructure
Conception
$200,000 CJ est. value
Ames, IA 50010

South Monon Freedom Trail - City of New Albany
Infrastructure
Design
$4,100,000 CJ est. value
New Albany, IN 47150

Rehabilitate Runway - City of Kokomo
Renovation, Infrastructure
Conception
$150,000 est. value
Kokomo, IN 46901

Bridge Replacement, Other Construction
Demolition, New Construction, Infrastructure
Design
$1,062,221 CJ est. value
Rushville, IN 46173

SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

Last Updated 07/25/2023 08:03 AM
Project Title

Loper Elementary School Renovation

Physical Address View project details and contacts
City, State (County) Shelbyville, IN 46176   (Shelby County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $6,739,623 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Shelbyville Central Schools (a public building corporation). Contractors are advised that the Contract as finally entered into with any successful Bidder may be entered into with either the School Corporation or the Building Corporation or certain portions of the Contract may be entered into by both the School Corporation and the Building Corporation. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts Bid Results: General Trades Gibraltar Construction $2,199,000 Flooring Jack Laurie Group $596,800 Painting Anthony Anderson Corp $109,100 Acoustical Treatments & Ceilings Perry Acoustics $308,900 Casework Midwest Cabinet Solutions $276,323 Plumbing & Mechanical Lehman's Mechanical Contractors, Inc. $2,114,000 Electrical & Technology West Electric $1,135,500

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents