Similar Projects
Water Plant No. 4 Ground Storage Tank Replacement
Infrastructure
Bidding
$2,106,000 est. value
Alvin, TX

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Repair of Unit 43578
Infrastructure
Post-Bid
Houston, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

Rehabilitation of the Balsam 500,000 Gallon Elevated Water Storage Tank
Results
Less than $575,000 est. value
Lake Jackson, TX

530 Gallon Stainless Steel Rainwater Catchment System
Infrastructure
Post-Bid
Houston, TX

North Water Plant Ground Storage Tank
Infrastructure
Results
$660,000 est. value
Richwood, TX

Liberty and Mclean Elevated and Ground Storage Tank Rehabilitation
Infrastructure
Post-Bid
Pearland, TX

Ground Storage Tank No. 1 Replacement Project
Infrastructure
Results
Holiday Lakes, TX

Tank Mixer Improvements
Infrastructure
Post-Bid
$200,000 est. value
Lake Jackson, TX

Terrell Unit Replace Hot Water Storage Tank and Heat Exchangers - Room 529
Infrastructure, Alteration
Results
Rosharon, TX 77583

Construction of Elevated Storage Tank Recoating
Infrastructure
Results
$337,000 est. value
TX

Water Plant No. 6 Ground Storage Tank Replacement
Infrastructure
Results
Alvin, TX

Terrell Unit Water Tank
Infrastructure
Results
$225,586 est. value
Rosharon, TX 77583

Water Plant No. 2 - Ground Storage Tank and Booster Pump Station
Infrastructure
Results
$2,800,000 to $3,000,000 est. value
West Columbia, TX 77486

Reported 05/26/2022 12:00 AM
Project Title

Chenango Ground Storage Tank (GST) Replacement

Physical Address View project details and contacts
City, State (County) Angleton, TX 77515   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Angleton, Texas. Completed plans call for site work for a water / sewer project. The project generally consists of the construction of a 1 million gallons prestressed concrete ground storage tank for storage of drinking water at the Chenango Water Plant, located at 1030 North Chenango Street, Angleton, TX 77515. The project also includes installation of the associated piping, valves and appurtenances, electrical and instrumentation and controls systems, water line connections, site grading, drainage and installation of a concrete outfall structure, demolition of existing ground storage tank and water well, and all labor, equipment, materials, and incidentals required for this project. Each bid shall be accompanied by a bid bond in an amount not less than five percent of the largest possible total for the bid submitted as a guaranty of completion of the forms provided by the City within 10 days after notice of award. Bid sureties will be returned to all but the three lowest acceptable bidders within 24 hours after execution of the contract. The successful bidder must furnish a Performance Bond and Payment Bond, upon forms furnished by the City, each in the amount of 100 percent of the total contract price, from a surety company acceptable to the City of Angleton. The City reserves the right to reject any and all bids, to waive any and all technicalities and accept any bid from the lowest responsible bidder. In case of ambiguity or lack of clarity in stating the prices in the bids, the City reserves the right to consider the most advantageous construction thereof, or to reject the bids. Unreasonable or "Unbalanced" unit prices will be sufficient cause for rejection of any kind. In conformance with applicable statutes, the general prevailing wage rates in the locality in which the work is to be performed have been ascertained and such rates shall be the minimum paid for labor employed upon this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents