Similar Projects
Native Grown D/B/A Vara Wines
Renovation, Addition
Conception
Albuquerque, NM 87114

Unser Gateway - Phase II
New Construction
Design
Rio Rancho, NM 87124

Unser Gateway - Phase II
New Construction
Design
Rio Rancho, NM 87124

Water System Improvements
New Construction, Demolition
Post-Bid
San Cristobal, NM 87564

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Moonlight Development Phase 1
Results
Isleta Pueblo, NM

Paseo Del Rio
New Construction
Construction
Santa Fe, NM 87507

Unser Gateway
New Construction - 12,696,000 SF
Construction
$10,000,000 CJ est. value
Rio Rancho, NM 87124

Palomas Park
New Construction
Pending Verification
Albuquerque, NM 87122

Pilot Travel Center
New Construction
Pending Verification
Albuquerque, NM 87105

Ulta Beauty at Target #357
Renovation - 1,000 SF
Design
Albuquerque, NM 87112

Occupied Housing Repair Projects 1- Project
Renovation
Post-Bid
Anthony, Mesquite, NM 88201

10 Unit Rehabilitation/Modernization Project
Renovation
Results
Mescalero, NM 88340

Mesa Del Sol
New Construction
Construction
Albuquerque, NM 87105

Last Updated 02/04/2022 03:49 PM
Project Title

Cornum Subdivision

Physical Address View project details and contacts
City, State (County) Carlsbad, NM 88220   (Eddy County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Owner to Subcontract.
Project Status Construction Commenced June 2021, Construction Complete as of December 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fourteen single-family homes.

Details

14 Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents