Similar Projects
NCFI Roof Application for Continuing Education Building
Post-Bid
Jacksonville, NC 28546

Roof Repairs, Bldg 1400, Bb54, M326
Post-Bid
$250,000 to $500,000 est. value
Camp Lejeune, NC 28542

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roof Repair of Southwest Middle School
Results
Jacksonville, NC 28540

Replacement of Roofs Richlands High School
Post-Bid
Richlands, NC 28574

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing MACC
Post-Bid

Hunters Creek Middle School Roof Repair
Results
Jacksonville, NC 28546

Roofing Repair and Maintenance
Post-Bid

Replacement of Roof New Bridge Middle School
Results
Less than $132,155 est. value
Jacksonville, NC 28540

Southwest Elementary Re Roof Phase III
Post-Bid
Jacksonville, NC 28540

Roof Replacements Morton Elementary School
Results
Jacksonville, NC 28546

Replacement of Roofs Parkwood Elementary School
Results
Jacksonville, NC 28540

Replacement of Roofs Jacksonville High School
Results
Less than $206,111 est. value
Jacksonville, NC 28540

Replacement of Roofs Clyde Erwin Elementary
Results
Less than $271,184 est. value
Jacksonville, NC 28540

Last Updated 08/28/2020 09:21 AM
Project Title

Replacement of Roofs White Oak High School Vocational Building

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28546   (Onslow County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Deteriorated wooden nailer, material and labor needed for the removeal, disposal, and replacement of wooden nailer around perimenter of roof or any locations where wooden nailer exist by linear foot. Unit price is needed where contractor and Owner determine nailers are unusable for new roof installation. Unit Pricing is for deteriorated wooden nailer only. Deteriorated Metal roof deck- materials and labor needed for the removal, disposal and replacement of metal roof deck priced by the square foot. Unit price is needed where the Contactor and Owner determine metal roof deck is unsuitable for reuse. New metal deck shall match existing in thickness and configuration. Deteriorated insulation- Materials and labor needed for removal, disposal and replacement of deteriorated existing fiberboard insulation needed by square foot. Unit pricing is needed where the Contractor and Owner determine existing insulation is unsuitable for reuse. New insulation shall be the same thickness as what is being replaced (polyisocyanurate foam core, with organic felt facer sheet each face, conforming to ASTM C1289-01, Type III or Type IV.). Removal of existing EPDM single ply membrane, existing metal trim down to existing insulation and fiberboard (if any)and Recovering of roof with new , ½” gypsum core boards with fiberglass facer mat (DensDeck Prime Roof boards by Georgia Pacific, or equivalent and a new 60 mil, reinforced, smooth white, fully adhered TPO membrane roofing system with 20 year NDL manufacturer’s warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents