Similar Projects
Matador Achievement Center - California State University, Northridge
Demolition, New Construction, Infrastructure - 66,700 SF
Conception
$29,664,000 CJ est. value
Northridge, CA 91330

Vina Vieja Pickleball Court - 78086 - City Of Pasadena
New Construction, Infrastructure
Conception
$5,200,000 CJ est. value
Pasadena, CA 91107

Glendale Central Park Master Plan
Addition, Infrastructure
Design
$5,000,000 CJ est. value
Glendale, CA 91204

Neighborhood Park Picnic Shelter Installation
Demolition, New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Cerritos, CA 90703

Middle Restroom Addition - La Puente City Park
Addition, Demolition, Renovation, Infrastructure - 361 SF
Bidding
$375,000 CJ est. value
La Puente, CA 91744

RFP Design - Parks Restroom Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Pomona, CA 91766

Sport Field Renovations - Olive Middle School Soccer And Baseball Fields
Renovation
Results
$850,000 est. value
Baldwin Park, CA 91706

Junior Lifeguard Facility Modular Building
New Construction, Term Contract - 960 SF
Results
$500,000 to $750,000 est. value
Long Beach, CA 90803

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

Media Park Revitalization
Renovation, Alteration
Pending Verification
Culver City, CA 90232

Flower Market Mixed-Use Development
Demolition, New Construction, Infrastructure, Renovation - 373,765 SF
Pending Verification
$170,000,000 CJ est. value
Los Angeles, CA 90014

One Arroyo Project - Woodlands Loop and Streamside Walk - Construction Phase 77382 - City of Pasadena
New Construction, Infrastructure
Conception
$4,500,000 CJ est. value
Pasadena, CA 91101

Library Park Restroom Project
New Construction, Infrastructure
Bidding
$99,656 CJ est. value
Monrovia, CA 91016

Bennnet Kew Elementary School Shade Structure Installation
Renovation
Results
$90,000 est. value
Inglewood, CA 90303

Last Updated 09/20/2022 11:35 PM
Project Title

Vincent Park Restroom Project Phase 2

Physical Address View project details and contacts
City, State (County) Inglewood, CA 90302   (Los Angeles County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $489,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Duration 140 working days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 07/15/2022 5:00 PM (PDT) Replacing Existing Restrooms The work will consist, but not limited to, furnishing all equipment, tools, materials, and labor necessary to perform project administration, site visit and or investigation, notification, coordination, approved traffic control system, Federal, State and local safety devices, excavations, backfill and compaction, shoring, abandonment or removal of existing structures, installation of new structures or replacement of existing structures or part of structures, pavement, permanent pavement, protection of existing structures, repair of damaged structures caused by contractor operation, cleaning and disposal of all materials from the site. Work shall also include administration, mobilization and demobilization, obtain required permits, safety, NPDES compliance, work schedule and shop drawing submittals, attend all meetings, submit reports, submit photos, documentation, restoration of areas, and all other incidentals to complete the project. The aspects of the work includes all work stated in the Measurement and Payment, the Bid Schedule, All related works per plans and specifications including the referenced standard specifications. All work shall be in accordance with OSHA Standard including the Confine Space Safety Standard.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents