Similar Projects
Kump Field Parking Lot- City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Kump Field Parking Lot- City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

GAOA Lamoille Pavement Preservation Phase 2 Project for the Humboldt-Toiyabe National Forest
Alteration
Design
$250,000 to $500,000 est. value
Elko, NV

West Wendover Community Rec Center
New Construction, Infrastructure - 25,000 SF
Design
$5,000,000 CJ est. value
West Wendover, NV 89883

New Domestic Water Well Drilling (Gallagher Fish Hatchery and Spring Creek Rearing Station)
Infrastructure
Bidding
$543,496 CJ est. value
Ruby Valley, NV 89833

Bridge Construction SFIR 3(1)
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

Bridge Construction SFIR 3(1)
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

2022 Micro Slurry Project
Infrastructure
Results
$564,007 est. value
Elko, NV

Cold Mill, Place Plantmix Bituminous Surface With Open Grade, Barrier Rail, Guard Rail, Sign, Striping, Hydraulic, Structure, Lighting, and Its Improvements
Infrastructure
Results
$33,300,000 CJ est. value
Wells, NV 89835

Angel Park Apartments
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Elko, NV 89801

Elko Retail Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Elko, NV 89801

Newton Field Parking Lot - City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Ash Street Village Townhomes
New Construction, Infrastructure
Design
$4,526,400 CJ est. value
Elko, NV 89801

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chris Sherrin Way Parking Lot - City of Elko
Infrastructure
Conception
$500,000 CJ est. value
Elko, NV 89801

Last Updated 05/24/2023 02:27 PM
Project Title

Pavement Maintenance & ADA Site Upgrades Nevada Youth Training Center

Physical Address View project details and contacts
City, State (County) Elko, NV 89801   (Elko County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $624,007 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: NYTC 100 Youth Center Road, Elko, Nevada Base Bid Description: Construct ADA accessible parking in the Administration parking area and pavement maintenance, gutter repairs, crack fill, pavement patching and slurry seal of AC paving at Nevada Youth Training Center. Contract Time: 60 calendar days. Liquidated Damages: $600.00 per day. Prevailing Wages must be paid on this project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents