Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Last Updated 03/27/2020 09:18 AM
Project Title

Veterans Memorial Park Culvert Rehabilitation

Physical Address View project details and contacts
City, State (County) Griffin, GA 30223   (Spalding County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate extent and character of the Work is generally described as follows: Rehabilitation of an existing corrugated metal pipe located in Griffin Georgia. The pipe system located under the Veterans Memorial Park which consists of a circular concrete sidewalk with stone monuments placed around the perimeter of the circular walk. The invert of the pipe has deteriorated, and it will have to be re -built using a concrete pad poured the entire length of the pipe system. The invert rehabilitation will involve cutting the limits of the deteriorated invert to a clean edge before the concrete pad/invert is placed. After the invert has been repaired the entire interior is to be lined using a Cementous coating centrifugally installed (CCCP, centrifugally cast concrete pipe).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents