Similar Projects
PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Bidding
Pittsburgh, PA 15219

King PreK-8 Steam and Chilled Water Site Piping - General and Mechanical
Alteration
Bidding
Pittsburgh, PA 15212

Gualtieri Portable A/C Units
Post-Bid
Pittsburgh, PA 15219

Renting of 1.5 Ton Cooling Units at Gualtieri
Post-Bid
Pittsburgh, PA 15219

Construction of Workforce Development & Training Center - HVAC
Results
$30,000,000 to $40,000,000 est. value
Pittsburgh, PA 15212

HVAC Crawlspace Piping Replacement at the McAnnulty Elementary School
Results
Less than $493,000 est. value
Pittsburgh, PA 15236

Maintenance of Bauer and Mako Compressors
Term Contract
Post-Bid
Pittsburgh, PA 15219

HVAC Modifications for the Brightwood Fire Station
Results
Less than $169,950 est. value
Bethel Park, PA 15102

Center for Faculty Innovation Building Alterations - HVAC Construction
Post-Bid
Pittsburgh, PA 15212

Manchester Garage Engine Test Facility - HVAC Construction
Results
Pittsburgh, PA 15233

Municipal Building Roof Replacement and HVAC - General Construction
Post-Bid
Moon Township, PA

Richland Concessions - HVAC
Results
Gibsonia, PA 15044

Municipal Building Roof Replacement and HVAC - HVAC Construction
Post-Bid
Moon Township, PA

S 10th Street Bridge Dehumidification System
Results
$200,000 to $499,999 est. value
Pittsburgh, PA 15203

Renovation of Hillman Library - Phase 3 - HVAC Construction
Post-Bid
$4,100,000 to $4,500,000 est. value
Pittsburgh, PA 15260

Reported 12/23/2021 12:00 AM
Project Title

Mitigation Strategies - Design and Installation

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to: - Replacement of all obsolete controllers with JCI specific SNE and CGM control modules in new panels to control every air handling unit at each campus. - Integration of all existing to be replaced controllers of each branch CCAC campus buildings to a Metasys 11 virtual server. - Integration of all new IoT sensors to JCI OpenBlue user interface for real-time response. - Wiring of low voltage DDC in plenum rated cable. Exposed cable shall be in conduit. - Metasys User Interface graphics for all buildings. - One BMS workstation per campus. - One Dell Intel Core i7 processor Latitude rugged tablet per campus. - Coordination of IP addresses and drop locations with CCAC. - Owner training provided by JCI Metasys factory trained professionals. - Five (5) year parts and one (1) year labor warranty. CCAC’s goal for MBE/WBE participation is 20% (13% MBE and 7% WBE/DBE)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents