Similar Projects
B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Bidding
$35,000 to $40,000 est. value

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Bidding
$35,000 to $40,000 est. value

Replacement of Bridge 776
Post-Bid
MN

Bridge Nos. 30J011, 30J12, and 30J13 on Stanchfield Creek
Post-Bid
MN

Memorial Park Bridge & Trail
Results
$665,000 to $789,000 est. value
Shakopee, MN 55379

Bridge Replacement with Concrete Culvert, Approach Grading and Aggregate Surfacing
Results
$114,796 est. value
Chatfield, MN

Traffic Control and Bridge No.s 9030 (Minnesota) and B-16-5 (Wisconsin) 1.511 Miles
New Construction, Infrastructure
Bidding
MN

Bridge Removal and Replacement
Renovation, Infrastructure
Post-Bid
MN

Bridge 4575 Repair
Results
Coon Rapids, MN

Grading, Concrete Paving, Bituminous Paving, Tension Cable Guardrail and Bridge 05X05 0.616 Miles
New Construction, Infrastructure
Bidding
MN

Mosquito and Bungo Creek Bridge Replacements
New Construction
Post-Bid
Walker, MN

Bridge Approaches And Bridge No. 62028
Results
MN

Bituminous Surfacing, and Bridge 72X05 0.160 Miles
New Construction, Infrastructure
Bidding
MN

Bridge Construction for Bridge 45579 and Approaches
New Construction, Infrastructure
Post-Bid
Warren, MN

Old West Main Pedestrian Bridge Improvements
Results
Red Wing, MN 55066

Reported 01/25/2022 12:00 AM
Project Title

Area 1A Paul Bunyan Bridges Deck Replacement

Physical Address View project details and contacts
City, State (County) Benedict, MN   (Hubbard County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install only of 2 ½” X 11 ¼” X 12 feet, number one or better Douglas Fir deck planks, planed on 1 side and 2 edges, on two bridges on the Paul Bunyan State Trail near Benedict, MN. Bridge #1236 over the Benedict River is 100 feet in length and is 1.25 miles south on Hubbard county highway 38 from trunk highway 200. Bridge #1237 over the Kabekona River is 140 feet in length and is .2 miles south on Hubbard county highway 38 from trunk highway 200. All wooden planks have already been purchased by the DNR and will be delivered to the site using DNR personnel and equipment. All hardware must be supplied by the contractor and be identical to the original bolts utilized by Continental Bridge in Alexandria, MN.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents