Similar Projects
Affirmation Tower
New Construction
Conception
New York, NY 10018

Metro - Niagara Street Corridor Toilet Rooms - General Contract
Renovation
Design
$392,450 CJ est. value
Buffalo, NY 14207

Ductile Iron Pipe and Fittings - DEP
Infrastructure
Bidding
New York, NY

Main Terminal Building MEP Upgrades - Plumbing
Renovation
Sub-Bidding
$150,000 CJ est. value
Lake Ronkonkoma, NY 11779

Provide Addition - Plumbing Work
Addition, Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Morrisville, NY 13408

Tent Rental for Outdoor Classrooms in Barney Square Located at the U.S. Merchant Marine Academy
New Construction
Post-Bid
Great Neck, NY 11024

As Needed Plumbing Services and Repairs for the 2021 and 2022 School Year
Term Contract
Post-Bid
Croton-on-Hudson, NY

Snowmaking System Contract
Term Contract
Results
NY

Seneca Park Zoo - Trailside Cafe
Results
Rochester, NY 14621

James Sheffield Speed Skating Oval and Support Building Contract
New Construction - 3,000 SF
Construction
$11,000,000 to $13,000,000 est. value
Lake Placid, NY 12946

30-85 31 Street Mixed Use
New Construction - 20,919 SF
Pending Verification
Queens, NY 11102

34-29 37th Street Apartments
New Construction - 30,128 SF
Pending Verification
Long Island City, NY 11101

Hilltop Professional Development Center - Plumbing
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Nyack, NY 10960

Purchase of Smith Blair Pipe Repair Clamps and Couplings As Needed
Term Contract
Post-Bid
Yonkers, NY

Plumbing Supplies
Term Contract
Results
Hopewell Junction, NY

Last Updated 08/04/2022 04:09 AM
Project Title

Restroom Improvements at Lower Falls Restaurant - Plumbing Contract

Physical Address View project details and contacts
City, State (County) Castile, NY 14427   (Wyoming County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Misc. Recreational, Plumbing
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $113,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction Contract associated with the Restroom Improvements at Lower Falls Restaurant. The General Construction work generally includes asbestos abatement and demolition; concrete floor slab, wood stud partitions; insulation; doors and door hardware; interior finishes including gypsum board, ceramic tile and paint; bathroom accessories. Service-Disabled Veteran-Owned Set Aside: No Contract term: 270 days County(ies): Wyoming Location: Letchworth State Park, Lower Falls Area Business entities awarded an identical or substantially similar procurement contract within the past five years: None Estimated Range- $84,000 to $113,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents