Similar Projects
Atlantic Coast of MD 2021 Berm Reconstruction
Design
$10,000,000 to $25,000,000 est. value
Ocean City, MD

Poplar Island Cell 1C Inlet Repairs, Poplar Island, MD
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
MD

Everhart Refurbish and Improvement Near McHenry
Bidding
$100,000 to $500,000 est. value
Frostburg, MD

Design/Build Gun Club Road Mine Dewatering
Infrastructure
Bidding
$100,000 to $500,000 est. value
Westernport, MD 21562

CHOH 151201 Reconstruct/Stabilize Historic Stone Wall
Post-Bid
$5,000,000 to $10,000,000 est. value
Williamsport, MD

Pipes and Structures Replacement Program for Storm Drains
Term Contract
Post-Bid
$2,500,001 to $5,000,000 est. value
Largo, MD 20774

Watkins Mill Road-Travis Avenue Stream Restoration
Results
Gaithersburg, MD

Culvert Replacement - Station Road
Results
Newcomb, MD

Turkey Point Shoreline Management
Pending Verification
Edgewater, MD 21037

On-Call Stormwater Management Maintenance and Construction
Term Contract
Bidding
MD

Lagoon Weir Gate Installation
Post-Bid
Poolesville, MD

Brophietown Mine Seal Emergency Repair
Results
Frostburg, MD 21532

Calverton Channel Rehabilitation
Post-Bid
$2,500,001 to $5,000,000 est. value
Glenarden, MD 20774

HMGP Phase II Materials
Results
Ocean City, MD 21842

Slope Erosion Repair and Stabilization
Post-Bid
Forest Heights, MD

Last Updated 06/15/2021 08:47 AM
Project Title

Tanyard Branch Stream Bank Restoration Stabilization

Physical Address View project details and contacts
City, State (County) Easton, MD   (Talbot County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will restore and stabilize the North Fork Tanyard Branch, which is located adjacent to and under the Easton Utilities Power Plant 1 building. Work consists of rebuilding existing and creating new in-stream structures including a bankfull bench, a stone toe wall, and an imbricated wall along approximately 189 linear feet (LF) of stream.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents