Similar Projects
Last Updated | 07/22/2021 05:46 AM |
Project Title | I-55 from South of I-80 to South of Weber Rd - North Bound and Southbound Designed Overlay Drainage, Phase III |
Physical Address | View project details and contacts |
City, State (County) | Romeoville, IL 60441 (Will County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, roadway designed overlay (resurfacing), and drainage improvement. This is contract consists of milling of existing HMA surface, placing hotmix asphalt (HMA) binder course; Stone Matrix Asphalt (SMA) surface course on the mainline lanes, and HMA surface course on the shoulders. Pavement patching with Class B and D patches. Roadway drainage repairs, ditch grading, traffic control, landscaping, pavement marking, erosion and sediment control. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |