Similar Projects
Roadway Minor Rehab
Infrastructure
Conception
$2,554,504 CJ est. value
Lisbon, OH 44432

Raw Water Intake Improvements - Contract A and Contract B
Infrastructure
Design
$396,000 CJ est. value
East Liverpool, OH 43920

SR 517 - Roadway Minor Rehab
Infrastructure
Design
$617,327 CJ est. value
Leetonia, OH 44431

COL-Dresden Avenue Phase 1
Infrastructure
Bidding
$460,584 CJ est. value
East Liverpool, OH 43920

Thompson Park Public Restrooms
New Construction, Infrastructure
Bidding
$195,000 CJ est. value
East Liverpool, OH 43920

R+L Carriers Expansion / Columbiana
Addition, Demolition, Infrastructure, Renovation - 62,751 SF
Post-Bid
$10,000,000 CJ est. value
Columbiana, OH 44408

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Contract A : Kensington WWTP Upgrades, Phase II
Renovation, Infrastructure
Results
$831,804 CJ est. value
Lisbon, OH 44432

Contract B: Hanoverton Collection System, Pump Station and Force Main
New Construction, Infrastructure
Results
$5,991,800 CJ est. value
Lisbon, OH 44432

Roadway Minor Rehab - SR 14
Infrastructure
Design
$4,422,000 CJ est. value
Salem, OH 44460

Repairs and Improvements of the Library Parking Garage
New Construction, Infrastructure - 362 SF
Post-Bid
$300,000 CJ est. value
East Liverpool, OH 43920

Columbiana Countys Bridge Program
Demolition, New Construction, Infrastructure
Results
$317,317 CJ est. value
Lisbon, OH 44432

Highlandtown Dam Improvements
Infrastructure
Design
$680,000 CJ est. value
Salineville, OH 43945

K-12 School - United Local School District
New Construction, Infrastructure
Post-Bid
$41,736,938 CJ est. value
Hanoverton, OH 44423

Columbiana County's Bridge Program Project - COL-CR400-1.08
Demolition, New Construction, Infrastructure
Results
$1,646,829 CJ est. value
Lisbon, OH 44432

Last Updated 06/29/2023 12:28 PM
Project Title

Beaver Local School District New Fieldhouse

Physical Address View project details and contacts
City, State (County) Lisbon, OH 44432   (Columbiana County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,298,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 16, 2022, the bids have been rejected. This project is expected to rebid at a later date. Estimated budget is $4,900,000.00 for the New Fieldhouse and associated site work. Proposals must be submitted on forms furnished as part of the contract documents and must list the names of persons interested herein. Each proposal shall be sealed in an opaque envelope, addressed to the Beaver Local School District, with the name of the contractor and project name plainly marked on the envelope. The Beaver Local School District reserves the right to accept or reject any or all proposals.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents