Similar Projects
On-Call Region 1 Tree and Brush Cutting Services PA
Alteration
Bidding
OR

Ne 12th Avenue Stormwater Improvements
Term Contract
Post-Bid
$400,000 to $500,000 est. value
Hillsboro, OR 97123

Stormwater Management Facilities Maintenance Repair
Infrastructure
Post-Bid
Hillsboro, OR 97124

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Mountainside High School Field Turf Remediation
Alteration
Results
Beaverton, OR 97007

Vegetation Management and Stewardship Services FY23 Beaverton Creek
Alteration
Post-Bid
Hillsboro, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Results
$7,000,000 to $10,000,000 est. value
OR

4140 Southwest Watson Avenue Stormwater Outfall to Beaverton Ck Retrofit
Infrastructure
Post-Bid
$1,000,000 to $1,500,000 est. value
Beaverton, OR 97005

Herbicide Shoulder Spray
Term Contract, Alteration
Results
OR 97124

Durham AWRRF(Advanced Water Resource Recovery Facility) Train 5 Phase 1 Landscape and Irrigation
Alteration
Post-Bid
$110,000 est. value
Tigard, OR 97224

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

Bark Blowing Services
Term Contract
Post-Bid
Hillsboro, OR

US26 at Mendenhall Creek MP 45.45 to 45.71 Project
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

Purchase of Herbaceous Native Plant Material
Alteration
Post-Bid
Hillsboro, OR

SW 209th Avenue SW Kinnaman Road - SW Alexander Street
Infrastructure, Alteration
Results
$15,000,000 to $25,000,000 est. value
Aloha, OR 97007

Last Updated 07/14/2022 01:09 AM
Project Title

Kruger Creek Stabilization

Physical Address View project details and contacts
City, State (County) Tigard, OR   (Washington County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the following (the Work): 1. Installation of approximately 1,300 linear feet of 24-inch and 30-inch storm drainage pipe by trenching. 2. Installation of approximately 175 linear feet of 28-inch storm drainage pipe by slip lining. 3. Installation of storm drainage structures 4. Erosion and sediment control with in-water work, general excavation and slope stabilization. 5. Installation of rock buttress slope stabilization. 6. Creek bed restoration and stream enhancement. 7. Installation of gabion mesh retaining wall. 8. Gravel maintenance road rehabilitation. 9. Tree and invasive species removal. 10. Clean Water Services vegetated corridor seeding, planting, surface restoration, and maintenance period. 11. All other work required by the construction plans and specifications to rehabilitate Kruger Creek and stabilize adjacent slopes.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents