Similar Projects
Install New 4,000 Gallon Jet "A" Fuel System
Infrastructure
Bidding
Hazlehurst, MS 39083

Natural Gas Distribution System Tillatoba Expansion
Post-Bid
Oakland, MS

Gasoline Tank Inspection and Cleaning
Post-Bid
Gulfport, MS 39501

Natural Gas Distribution System
Results
Oakland, MS

Construction of the Gas Supply Line Improvements
Infrastructure
Results
Baldwyn, MS

6 Inch Gas Line Relocation at Myrtle, S.R. 178 Bridge Replacement 55.3, MDOT
Renovation, Infrastructure
Post-Bid
New Albany, MS

Project Pine Onsite Natural Gas Improvements
Infrastructure
Results
MS

Cast Iron Gas Main Replacement Phase III
Infrastructure
Post-Bid
$700,000 to $800,000 est. value
Canton, MS

Craft Road 6 Inch GP Gas Main Extension Project
Infrastructure
Results
$1,275,295 est. value
Olive Branch, MS 38654

Utica Hinds Campus Utility Relocation
Infrastructure
Post-Bid
Utica, MS

Dahomey Remove & Dispose Above Ground Fuel Tanks
Term Contract
Results
Less than $25,000 est. value
Boyle, MS 38730

Gas Line Extension
Infrastructure
Post-Bid
$150,000 est. value
Baldwyn, MS

Above Ground Fuel Storage Tank
Term Contract
Results
Poplarville, MS 39470

Water and Petroleum Pipeline Services
Infrastructure
Post-Bid
Chunky, MS

Vancleave Above Ground Fuel Storage Tanks
Infrastructure
Results
MS

Reported 01/25/2022 10:13 AM
Project Title

Landfill Gas Collection and Control System

Physical Address View project details and contacts
City, State (County) Petal, MS   (Forrest County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,181,920
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the following: 1. Blower/flareskid access road and site pad construction 2. Mechanical and electrical installation of an owner-supplied blower/flareskid. 3. Approximately 1,536 lf of extraction well drilling. 4. Installation of 6 condensate sumps 5. Installation of piping and fittings required for LFG, air, and condensate/leachate forcemain lines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents