Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Citywide Valve Replacement Project
Term Contract
Bidding
South Gate, CA

Construction Management for Alvarado 2nd Pipline
Term Contract
Bidding
$300,000 to $350,000 est. value
San Diego, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Kern River RD Toilet Site Work Project, Sequoia National Forest
Alteration
Design
$250,000 to $500,000 est. value
CA

On-Call Utility Repair Services
Infrastructure
Bidding
Stockton, CA

Lake Mendocino (CVD) Septic Service
Alteration
Post-Bid
Ukiah, CA 95482

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Sheila Tank Replacement and PRV Improvements Project
Infrastructure
Bidding
$5,000,000 est. value
Pacifica, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Last Updated 04/08/2022 06:01 AM
Project Title

Cleveland Avenue and St. Rose District Sewer and Water Improvements

Physical Address View project details and contacts
City, State (County) Santa Rosa, CA 95405   (Sonoma County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,886,060
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will abandon approximately 700 feet of clay sewer main on the west side of Cleveland between Ridgway Avenue and Carrillo Street by transferring 23 laterals to an existing PVC sewer trunk on the east side of Cleveland Avenue. Additionally, this project will include sewer system improvements for 7th Street and B Street. The work on 7th Street will abandon 540 feet of clay sewer main and transfer 2 laterals to an existing sewer trunk between A Street and B Street. The work on B Street includes replacing a 30-foot section of deteriorated pipe near Healdsburg Avenue. This work will reduce inflow and infiltration and reduce maintenance costs.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents