Similar Projects
4 - Lane Roadway Construction
Infrastructure
Conception
$36,600,000 est. value
New London, MN 56273

Kandiyohi HRA Lakeview Apartment Window and Exteriors
Renovation
Design
$400,000 CJ est. value
Willmar, MN 56201

Northeast Water Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Willmar, MN 56201

North Smoky Hills Graveling
Renovation
Post-Bid

CSAH 44 Grading and Aggregate Base
Post-Bid
MN

Rubberized Asphalt Crack Filling
Results
MN

2021 Bituminous Surfacing
Results
$2,647,890 est. value
Willmar, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 Bituminous Surfacing
Results
$2,647,890 est. value
Willmar, MN

CF-22, Rubberized Asphalt Crack Filling
Infrastructure
Post-Bid
MN

Bituminous Surfacing
Results
MN

Pavement Rehabilitation - Willmar HQ
Infrastructure
Post-Bid
$132,900 est. value
Willmar, MN

2021 Roadway Improvement
Results
$200,000 est. value
MN

D8 Pavement Rejuvenation-Tracy and Slayton Stations
Infrastructure
Post-Bid
$200,000 est. value
Willmar, MN

2nd Street Southeast
Results
Willmar, MN 56201

Last Updated 08/08/2022 10:38 AM
Project Title

Block 25 Lofts

Physical Address View project details and contacts
City, State (County) Willmar, MN 56201   (Kandiyohi County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the new construction of a new apartment complex. As of August 8, 2022, construction is underway and began in May 2022. An architect has been selected and the developer is acting as the general contractor. Sub-Contracting needs are unknown at this time. Construction is expected to be completed in the first quarter of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents