Similar Projects
Upgrade HVAC
Alteration
Bidding
Saint Louis, MO 63110

HVAC Services for the Philips Park Pavilion
Addition
Bidding
Columbia, MO 65201

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Hickman High HVAC Replacement
Renovation, Alteration
Bidding
Columbia, MO 65203

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Lange Middle Cooling Tower and Chiller Replacement
Results
Columbia, MO 65202

Projects and Facility Improvements Under a Guaranteed Energy Savings Contract
Alteration
Bidding
MO

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Ward Edwards NOC Cooling System Replacement Project
Results
Warrensburg, MO

HVAC Controls and HVAC Replacement
Alteration
Bidding
Kirksville, MO 63501

HVAC
Alteration
Post-Bid
MO

Rec-Plex South Evapco Cooling Tower Replacement and Warm Brine Supply Pipe Rerouting
Alteration
Results
Saint Peters, MO

Reported 11/06/2021 12:00 AM
Project Title

Multi-Purpose Building 15 Ton HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO   (Butler County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Poplar Bluff R-I School District wished to secure sealed bids for the following projects; 1. Replacing 15 ton HVAC system in Multi-Purpose Building at Eugene Field Elementary. 2. Replacing two 20 ton rooftop condensing units and one 15 ton package unit at Kay Porter Theater. 3. Replacing HVAC system in the office/hallway at Eugene Field Elementary. 4. Replacing HVAC unit at Oak Grove Elementary Multi-Purpose Building. 5. Asbestos removal at old bank building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents