Similar Projects
Last Updated | 04/02/2021 03:20 AM |
Project Title | Two Lane Resurfacing - MIA-SR 571/Main St Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Tipp City, OH 45371 (Miami County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Improving a Section In Miami County, Ohio, In Accordance With Plans And Specifications By Resurfacing An Existing Roadway And Related Work. Section 0001 Roadway Line Alt Item Code Item Description Wt Unit Quantity 0001 203e10000 Excavation (Wt: 06) 06 Cy 300.000 Section 0002 Pavement Line Alt Item Code Item Description Wt Unit Quantity 0002 253e02000 Pavement Repair (Wt: 16) 16 Cy 400.000 0003 254e01001 Pavement Planing, Asphalt Concrete, As Per Plan (1 1/2") (Wt: 13) 13 Sy 10,385.000 0004 254e01600 Patching Planed Surface (Wt: 16) 16 Sy 105.000 0005 304e20000 Aggregate Base (Wt: 09) 09 Cy 300.000 0006 407e20000 Non-Tracking Tack Coat (Wt: 10) 10 Gal 778.000 0007 441e50000 Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 (Wt: 10) 10 Cy 435.000 Section 0003 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0008 632e26501 Detector Loop, As Per Plan (Wt: 44) 44 Each 2.000 0009 632e27200 Loop Detector Tie In (Wt: 44) 44 Each 2.000 0010 644e00200 Lane Line, 4" (Wt: 45) 45 Mile 0.610 0011 644e00300 Center Line (Wt: 45) 45 Mile 0.770 0012 644e00400 Channelizing Line, 8" (Wt: 45) 45 Ft 398.000 0013 644e00500 Stop Line (Wt: 45) 45 Ft 62.000 0014 644e00600 Crosswalk Line (Wt: 45) 45 Ft 319.000 0015 644e01300 Lane Arrow (Wt: 45) 45 Each 7.000 0016 644e01400 Word On Pavement, 72" (Wt: 45) 45 Each 1.000 Section 0004 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0017 614e11110 Law Enforcement Officer With Patrol Car For Assistance (Wt: 39) 39 Hour 10.000 0018 614e20550 Work Zone Lane Line, Class Iii, 4", 642 Paint (Wt: 39) 39 Mile 1.220 0019 614e21550 Work Zone Center Line, Class Iii, 642 Paint (Wt: 39) 39 Mile 1.540 0020 614e23680 Work Zone Channelizing Line, Class Iii, 8", 642 Paint (Wt: 39) 39 Ft 796.000 0021 614e26610 Work Zone Stop Line, Class Iii, 642 Paint (Wt: 39) 39 Ft 62.000 0022 614e27620 Work Zone Crosswalk Line, Class Iii, 642 Paint (Wt: 39) 39 Ft 638.000 0023 616e10000 Water (Wt: Nr) Nr Mgal 0.250 Section 0005 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0024 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0025 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0026 623e10000 Construction Layout Stakes And Surveying (Wt: Nr) Nr Ls 1.000 0027 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |