Similar Projects
LA 3213: Gramercy Bridge Rehabilitation
Infrastructure
Design
$70,000,000 CJ est. value
Vacherie, LA 70090

LA 3213: Gramercy Bridge Rehabilitation
Infrastructure
Design
$70,000,000 CJ est. value
Vacherie, LA 70090

Marketplace Centre
New Construction, Infrastructure - 13,200 SF
Sub-Bidding
$2,000,000 CJ est. value
Paulina, LA 70763

Marketplace Centre
New Construction, Infrastructure - 13,200 SF
Sub-Bidding
$2,000,000 CJ est. value
Paulina, LA 70763

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

La 3125: Left Turnlane at n King Ave
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

LA 70: Sunshine Bridge Emer Truss Repair
Infrastructure
Design
$500,000 CJ est. value
Saint James, LA 70086

Asphaltic Concrete Pavement Preservation 2022-2023
Infrastructure
Post-Bid
Convent, LA

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

Loc Rd Over Borrow Pit(Blind Rv Bt Lnch)
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Convent, LA 70723

LA 70: Sunshine Bridge - LA 22
Infrastructure
Post-Bid
$50,000,000 CJ est. value
Saint James, LA 70086

Road and Drainage Maintenance Program
Infrastructure
Results
$300,000 est. value
Lutcher, LA

US 61: Double Left Turn Onto LA 641 SB
Infrastructure
Design
$1,000,000 CJ est. value
Convent, LA 70723

Last Updated 04/05/2023 02:20 PM
Project Title

Formosa Plastics Sunshine Project

Physical Address View project details and contacts
City, State (County) Saint James, LA 70086   (Saint James County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $12,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the phased new construction of a petrochemical plant on 2,400 acres. Phase one consists of an ethylene plant, associated polymer plants, an ethylene glycol plant, a propylene plant and associated polymer plant and ancillary support facilities for product loading and utilities, including electricity and wastewater treatment. Phase two includes an ethylene plant, associated polymer plants and ethylene glycol plant. Scope details have not been released. As of April 5, 2023, this project is currently on hold due to active litigation against the project as well as additional clearance from the U.S. Army Corps of Engineers. The Army Corps of Engineers conditionally approved a permit in September 2019. Information regarding the architect, general contractor and method of selection has not been disclosed. No permits have been applied for or approved for through St. James Parish since April 2020. A construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Owner information: Headquarters +886 5 681 2345 Taipei Office +886 2 2712 2211 Service Hotline 0800 060 088 You may also send them a message via their website: http://www.fpcc.com.tw/en/contact.php

Details

1 Story Above Grade, Acre, 1600 Acre.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents