Similar Projects
Urbana at Centerville
New Construction
Conception
Garland, TX 75040

Preston Center Apartment Tower
New Construction
Design
Dallas, TX 75225

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Paving Improvements for Galloway Place Neighborhood and Northridge Addition Repairs
Results
$1,250,000 est. value
Mesquite, TX

Arapaho Park - Site Improvements
Results
$465,400 est. value
TX 75248

The Academic Apartment Development
New Construction
Construction
Dallas, TX 75204

Broadstone Apartments
New Construction
Construction
$65,000,000 est. value
Dallas, TX 75205

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

McKinney Avenue/Cole Two-Way Conversion
Post-Bid
Dallas, TX 75295

Flagpole Hill - Phase One Improvements
Renovation
Results
Dallas, TX

Lake Shore Apartments
New Construction
Construction
Irving, TX 75039

Last Updated 02/27/2023 01:05 PM
Project Title

Woodwind Development - Phase II

Physical Address View project details and contacts
City, State (County) Irving, TX 75038   (Dallas County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Construction of three, three-story buildings for a multifamily complex, along with a dog park and playground As of February 27, 2023, building permit applications have been submitted for review. An architect has been selected; however, a general contractor or selection method has not been disclosed. A firm construction timeline has not been established, although not likely to start before 2nd quarter 2023.

Details

3 Stories Above Grade, 90,592 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents