Similar Projects
Lynburke Apartments
Renovation - 1,204 SF
Conception
Lyndon, VT 05851

Residential Subdivision
New Construction
Conception
Williston, VT 05495

Cambrian Rise - Building C
New Construction - 160,000 SF
Design
$89,220,000 est. value
Burlington, VT 05401

Burlington Town Center Mall Redevelopment - CityPlace
New Construction - 763,200 SF
Design
$10,000,000 CJ est. value
Burlington, VT 05401

Village Center Apartments
New Construction - 22,000 SF
Sub-Bidding
Morrisville, VT

Notice of Request for Bid Proposals from Qualified Sub-Contractors
Renovation, Demolition
Sub-Bidding
Colchester, VT 05446

Flat Street Mixed Use
New Construction, Addition - 16,000 SF
Post-Bid
Brattleboro, VT

Snow Creek Condos
Renovation - 374,000 SF
Post-Bid
Hartford, VT 05047

Sunderland Farms
New Construction - 305,475 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Colchester, VT 05446

Mixed-Use Planned Unit Developement
New Construction, Demolition - 9,300 SF
Construction
$3,775,800 est. value
Milton, VT 05468

New Building
New Construction
Pending Verification
West Dover, VT 05356

Lake Road Mixed-Use
Renovation
Pending Verification
Benson, VT 05743

Old Farm Road Development
New Construction - 1,285,000 SF
Conception
$10,000,000 CJ est. value
South Burlington, VT

Retreat Farm Expansion
New Construction, Renovation - 50,000 SF
Design
$15,000,000 est. value
Brattleboro, VT 05301

Stuart Avenue
New Construction
Post-Bid
Colchester, VT

Last Updated 09/17/2020 09:27 AM
Project Title

Alterations to Select Units and Common Areas at Sheldon Towers

Physical Address View project details and contacts
City, State (County) Rutland, VT 05701   (Rutland County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacement of doors, kitchen cabinets, finishes, lighting, and some plumbing in approximately 15 units. Work in common areas includes floor finish and base replacement. Asbestos abatement by the Contractor will be required. The work will be performed in three phases of 5 units each.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents