Similar Projects
Duct Vent Cleaning
Alteration
Bidding
Boston, MA

Purchase Sigma Steam Unit Heaters
Alteration
Bidding
Boston, MA

Diesel Exhaust Maintenance and Repairs
Term Contract
Post-Bid
Boston, MA 02118

Bathroom Exhaust Improvements 2020 - General Bids
Post-Bid
$245,000 est. value
Boston, MA

12 Channel Street Operations Center - General Bid
Results
Less than $1,996,916 est. value
Boston, MA

Purchase Systemwide Cleaning and Sanitizing HVAC Ducting and Equipment
Term Contract
Results
$142,464 est. value
Boston, MA

HVAC Systems Maintenance
Alteration
Bidding
$770,000 est. value
Boston, MA

Bathroom Exhaust Improvements 2020 - Filed Sub-Bids
Post-Bid
$245,000 est. value
Boston, MA 02210

BCEC BMS and HVAC Upgrade - General Bids
Results
$4,300,000 est. value
Boston, MA

Doris Bunte RAD Conversion - Filed Sub Bids
Post-Bid
Boston, MA

Up Academy Unit Ventilator Replacement
Results
Less than $2,112,917 est. value
Boston, MA

Installation of HVAC Equipment in the Server Room at BRCPS
Post-Bid
Hyde Park, MA 02136

HVAC Services - Chelsea Public Schools
Results
$645,000 est. value
Chelsea, MA

Clark Athletic Relocation Renovations - Sub-Bids
Post-Bid
Less than $923,620 est. value
Boston, MA

TRD01 HVAC and Lighting Reservoir
Results
Boston, MA 02116

Last Updated 10/06/2021 01:32 PM
Project Title

EAHU 1&2 Fan Retrofit and Multi-Stack Chiller Replace

Physical Address View project details and contacts
City, State (County) Boston, MA 02111   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Exhaust Air Handler #1 & #2 Fan Wall Retrofit and Multi-Stack Chiller Replacement at the Jean Mayer Human Nutrition Research Center on Aging (HNRC), Boston, MA. Description of Work: Base - Existing EAHU-1 & EAHU-2 shall be retrofitted for the installation of new fan wall systems. The work shall be phased in such a way that the isolation dampers are closed and one level of the air handler remains in operation while work is being conducted on the other. Asbestos Abatement: remove approximately 75 linear feet of non-friable mastic (sealant) on the exhaust air handler sound attenuators. Option – Chiller Replacement: The existing chiller and condenser units serving it shall be demolished. The existing structure supporting the condenser units shall be reused and modified as required for the installation of the new units. New chiller shall be Integrated into existing control system. The existing pumps serving the chiller shall be demolished and replaced with new Pumps. New pumps shall be integrated into the existing control system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents