Similar Projects
2019/20 Low Point Drainage (Top O Hollow, 28th, and Kennedy) - City of Ames
Infrastructure
Conception
$200,000 CJ est. value
Ames, IA 50010

13th and 8th Avenue Overpass Project
New Construction, Infrastructure
Design
$26,000,000 CJ est. value
Terre Haute, IN 47804

13th and 8th Avenue Overpass Project
New Construction, Infrastructure
Design
$26,000,000 CJ est. value
Terre Haute, IN 47804

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Indiana State University Tunnel Repairs 2023
Infrastructure
Bidding
$508,863 CJ est. value
Terre Haute, IN 47809

Site Improvements and Related Work at Various Locations
Post-Bid
IN

HMA Paving Work Order
Infrastructure
Post-Bid
Terre Haute, IN

Springhill Drive Road Reconstruction
Results
Terre Haute, IN 47802

CSO 008 Green Infrastructure Improvements
Infrastructure
Results
$3,080,000 est. value
Terre Haute, IN

New Campus for Ventures - Rose-Hulman Institute of Technology
New Construction, Infrastructure - 70,000 SF
Pending Verification
$29,000,000 CJ est. value
Lost Creek Township, IN 47803

Terre Haute Multi-Sports Complex and Waterpark - City of Terre Haute
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Terre Haute, IN 47807

HMA Overlay, Preventive Maintenance - US 41
Infrastructure
Design
$3,863,716 CJ est. value
Terre Haute, IN 47802

Terre Haute DOR - SWA-2N - 13-1/2 Street and 14th Street from Franklin Street to Cruft Street
Infrastructure
Post-Bid
$200,000 est. value
Terre Haute, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Bridge Removal - US 41
Demolition, Infrastructure
Design
$2,744,356 CJ est. value
Terre Haute, IN 47802

Last Updated 03/15/2023 04:31 AM
Project Title

HMA Overlay, Preventive Maintenance - US 150

Physical Address View project details and contacts
City, State (County) West Terre Haute, IN 47885   (Vigo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $4,887,869 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

From 2.10 mi W of US 41 to 0.6 mi W of US 41 As of March 15, 2023, the project is in Design status. Anticipated letting date is January 18, 2024. INDOT - HMA Overlay, Preventive Maintenance - US 150 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents