Similar Projects
2022 Paving Project
Alteration
Bidding
$110,000 est. value
Connellsville, PA

Roadway Utility Cut Repairs
Post-Bid
Dunbar, PA

2021 Roadway Surface Treatment Project
Post-Bid
McClellandtown, PA 15458

SIP 12-20-SI1-1
Results
$2,500,000 to $4,999,999 est. value
PA

Roadway and Miscellaneous Repairs
Results

Asphalt Seal Coat
Post-Bid
Brownsville, PA

SGL 24 Little Coon Road Maintenance Project
Results
Farmington, PA

2021 Road Reconstruction Project
Infrastructure
Post-Bid
Uniontown, PA

2021 Road Improvement Project
Results

Milling of Asphalt Paved Surface
Infrastructure
Post-Bid
Uniontown, PA

Superpave Wearing Course
Results
Everson, PA

Superpave Wearing Course
Infrastructure
Post-Bid
Grindstone, PA

62,035 SY Asphalt Seal Coat, Double Application
Results
Lemont Furnace, PA

Asphalt Seal Coat Double Application
Infrastructure
Post-Bid
Grindstone, PA

Superpave Wearing Course
Results
Lemont Furnace, PA

Last Updated 05/17/2022 07:01 AM
Project Title

I-70 at PA 51 Interchange

Physical Address View project details and contacts
City, State (County) Belle Vernon, PA   (Fayette County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $124,999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project is as follows: Widening and reconstruction of Interstate 70 along with reconstruction of the PA 51 Interchange (Exit 46) to eliminate the substandard cloverleaf interchange and replace it with a Diverging Diamond Interchange. To accommodate new interchange, project limits on PA51 are 1.5 miles in length with approximately one (1) mile involving reconstruction and widening. Project involves several intersecting roads including the relocation of Finley Road (Township Road) to form plus intersection with PA 981 and construction of three (3) cul de sacs. Project includes work to rehabilitate or replace eight (8) different structures, two of which are railroad owned structures. Structure work consists of replacement of bridge on PA 51 over I-70 with dual structures, replacement of Wheeling and Lake Erie railroad bridge over PA 51, rehabilitation and full painting of Smithton High Level Bridge, and other work to extend and rehabilitate other smaller structures within the project, including the Cedarbrook Golf Course Tunnel. Project requires coordination with both Wheeling and Lake Erie and CSX railroads and includes a design build traffic control plan with detailed conceptual plan provided. Additionally, the project will include nine (9) stormwater management basins, use of column supported embankments, steepened rock slope construction, incorporated sewer line construction, traffic signals, new interchange signing including overhead sign structures, pavement markings, guide rail, drainage, highway lighting, ITS relocation work, channel relocation, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 70, SECTION E10, in WESTMORELAND COUNTY ROSTRAVER TOWNSHIP from approximately one (1) mile west of PA 51 at segment 0450/0451 offset 1381 to just east of Smithton High Level Bridge at segment 0480/0481 offset 0751 EB/0729 WB.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Exterior Lighting, Roadway Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents