Similar Projects
Demolition Project
Post-Bid
Petersburg, VA 23803

Wall Build and Painting
Post-Bid
Richmond, VA 23220

P--Demolition Services- Shenandoah National Park, VA
- 1,500 SF
Results
Shenandoah, VA

Building Demolition at Staunton Crossing
Results
VA

Newport News Transit Center Site Reconstruction
Construction
$47,000,000 est. value
Newport News, VA

Structure Demolition 1211 Rodman Avenue
Demolition
Post-Bid
Portsmouth, VA 23704

Fort Eustis Multi Building Demolition Project
Demolition
Results
$1,000,000 to $5,000,000 est. value
Fort Eustis, VA

Remove Building or Wall - 12183 Oakland Drive
Demolition
Post-Bid
Eastville, VA 23347

Demolition of at Grade Concrete Slab and Related Restoration
Results
Newport News, VA 23607

Remove Building or Wall - Indian Walk Lane
Post-Bid
Eastville, VA 23347

Nansemond Treatment Plant Land Acquisition - Land Stabilization (NP013500) and Nansemond Treatment Plan Land Acquisition - Structure Demolition (NP013600)
Results
$4,715,000 est. value
Suffolk, VA 23435

Remove Building or Wall - 10727 Bayside Road
Post-Bid
Eastville, VA 23347

Basketball Court at Hillside Court
Term Contract
Results
Richmond, VA

Structural Demolition Project
Post-Bid
Portsmouth, VA

Demolition and Proper Disposal of C.S. Monroe School
Demolition
Results
Leesburg, VA

Last Updated 04/23/2021 11:17 AM
Project Title

Fuel Station Replacement Project

Physical Address View project details and contacts
City, State (County) Spotsylvania, VA 22407   (Spotsylvania County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,999,999
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing fuel island canopy superstructure, canopy footings, bollards, concrete islands, concrete parking pad and associated items indicated, and installation of new concrete pad and islands, and installation of new canopy superstructure and other associated items, including reinstallation of fueling stations, card reader and other indicated items.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Structure Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Other Specialties.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents