Similar Projects
SIUE Health Sciences Building
New Construction, Renovation - 221,000 SF
Design
Less than $105,370,000 est. value
Edwardsville, IL 62025

Rendleman Hall Renovation
Renovation
Design
Edwardsville, IL

Classroom Equipment and Installation
Renovation, Alteration
Post-Bid
Godfrey, IL 62035

Commissioning Services for SDM Auditorium
New Construction, Infrastructure - 37,828 SF
Post-Bid
Alton, IL 62002

Repair Structure and Foundation
Renovation, Infrastructure
Results
Less than $400,000 est. value
Godfrey, IL 62035

Morris University Center AHU S-1 Replacement
Renovation, Infrastructure
Results
Edwardsville, IL 62025

Architect Lead Team for Rendleman Hall Renovation
Renovation
Post-Bid
Edwardsville, IL

Replace Digester Lid
Alteration
Results
Less than $700,000 est. value
Edwardsville, IL

Plumbing Supplies
Term Contract
Post-Bid
Edwardsville, IL 62025

Chilled Water Piping Replacement SFC
Renovation, Alteration
Results
Edwardsville, IL

Electrical Supplies
Term Contract
Post-Bid
Edwardsville, IL 62025

Boiler & Chiller Replacement
Alteration
Results
Belleville, Granite City, IL 62220

Woodland Hall Parking Lot - General
Renovation, Infrastructure
Post-Bid
Edwardsville, IL 62025

Robotics Lab
Renovation
Results
Edwardsville, IL

Design-Build Services for Health Sciences Building Phase I
New Construction, Renovation - 221,000 SF
Results
$105,370,000 est. value
Edwardsville, IL 62025

Last Updated 07/22/2022 06:32 PM
Project Title

Replace Water Distribution Systems (Plumbing- Remodel and Rehab)

Physical Address View project details and contacts
City, State (County) Edwardsville, IL 62025   (Madison County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,590,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Southern Illinois University - Replace Water Distribution Systems A PLA is required for this project. This contract will be a Single Prime. Project Manager Mark Hendricks Phone Number (618) 800-4375 AE Estimate - Less than $2,000,000 The consists of installation of new water service lines and interior plumbing improvements, elevated water tower painting, new vertical turbine pumps, ground storage and elevated reservoir improvements, new water mains, and inspection and improvements to campus water valves. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 4% MBE/WBE, 1% VBE/PBE.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents