Similar Projects
Indoor Shooting Range
New Construction - 30,000 SF
Conception
$8,000,000 est. value
Lake Geneva, Lyons, WI 53147

Community Development Block Grant (CDBG) Close Program
New Construction
Design
Elkhorn, WI

Hodag Park Music Gazebo
New Construction, Infrastructure - 220 SF
Bidding
$260,000 est. value
Rhinelander, WI 54501

Winnebago County Sherrif's Boathouse
Renovation
Bidding
Oshkosh, WI 54901

Maintenance of Parks Facilities and Structures
Post-Bid
Less than $85,000 est. value
Manitowoc, WI 54220

Park Pavilion and Site Improvements Design RFP
New Construction
Post-Bid
Appleton, WI 54913

Firemen's Park Shelter
Results
Germantown, WI 53022

Indoor Group Camp Remodel
Renovation
Results
Less than $200,000 est. value
Bagley, WI 53801

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Shoot Point Blank
New Construction - 13,187 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Greenfield, WI 53228

Port Washington Avenue Mixed Use Development
New Construction
Pending Verification
Milwaukee, WI 53212

Plamann Park Pavilion
New Construction - 6,660 SF
Bidding
Appleton, WI 54913

Torch Lake Campground Improvements - Phase 3
Post-Bid
Conover, WI

Field House Renovations Rec Sites - Clovernook, Columbia, Custer, Franklin and Southlawn
Renovation
Results
Milwaukee, WI 53223

McCarthy Park Improvements
Renovation
Bidding
Cottage Grove, WI 53527

Last Updated 02/09/2022 02:19 PM
Project Title

William Waters Gazebo

Physical Address View project details and contacts
City, State (County) Oshkosh, WI   (Winnebago County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a 290-sf outdoor cast-stone gazebo with associated site work. Project includes prefabricated cast stone veneer gazebo (coping, columns, architrave, gable veneer), back-up gable CMU wall, wood-framed roof structure, metal tile roofing, cement board soffit, metal railings, electrical, prefabricated cupola, and other associated work. The facility will be constructed with a concrete slab and concrete foundations.

Details

Misc. Recreational, Approximately 290 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents