Similar Projects
Mount Rushmore National Memorial - Renovate Water Storage Tanks
Results
$1,000,000 to $5,000,000 est. value
Keystone, SD

Installation of a New Underground Storage Tank
Infrastructure
Results
$483,000 est. value
Avon, SD

10,000 Gallon Storage Tank
Term Contract
Post-Bid
SD

Geddes Consolidation Project Phase 3: 3.0 MG Ground Storage Reservoir
Post-Bid
$1,850,000 est. value
SD 57369

50,000 Gallon Water Tower Improvements
Infrastructure
Results
Castlewood, SD

Mitchell West Water Tower Improvements
Alteration
Results
Mitchell, SD

Water Distribution Improvements - Elevated Water Tower
Infrastructure
Results
$700,000 to $1,000,000 est. value
Lake Preston, SD

250,000 Gallon Water Tower No. 6A
Infrastructure
Results
SD

Volga 750,000 Gallon Water Tower 2020
Results
$2,600,000 to $2,800,000 est. value
Volga, SD

Water Meter, Water Tower and Lift Station Improvements
Renovation, Infrastructure
Results
$48,750 est. value
Saint Lawrence, SD

Water Tower No. 2A Improvements
Infrastructure
Results
$2,800,000 to $3,200,000 est. value
Dell Rapids, SD 57022

Water Tower Rehabilitation
Infrastructure
Results
$400,000 est. value
Hartford, SD

Saint Lawrence Water and Wastewater Improvements
Infrastructure
Results
$48,750 est. value
Saint Lawrence, SD

Water Tower Rehabilitation and Repair
Infrastructure
Post-Bid
$125,000 est. value
Canova, SD

Mount Rushmore National Memorial - Renovate Water Storage Tanks
Renovation
Results
$1,000,000 to $2,000,000 est. value
Keystone, SD

Last Updated 05/31/2022 04:29 AM
Project Title

Milbank Ground Storage Reservoir Improvements

Physical Address View project details and contacts
City, State (County) Milbank, SD   (Grant County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Surface preparation and recoating of interior of carbon steel ground storage reservoir. Interior shall be abrasive blasted and completely coated with zinc-rich primer and a single full coat of epoxy, a stripe coat of epoxy shall be applied after primer; Surface preparation and recoating of exterior of carbon steel ground storage reservoir. Exterior shall be abrasive blasted and completely coated with zinc-rich primer, intermediate coat of polyurethane and a top coat of fluoropolymer, with a stripe coat of epoxy shall be applied after primer; New Fail-Safe Vent

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents