Similar Projects
Morrills Corner - State Route 302 and 100
Alteration
Conception
Portland, ME 04101

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Carr Woods
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cape Elizabeth, ME 04107

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Douglass Commons
New Construction, Infrastructure - 338,700 SF
Post-Bid
$27,000,000 CJ est. value
Portland, ME 04102

Interstate 295 Southbound Over State Route 703 and Interstate 295 Southbound Over Westbrook Street Bridge Joints
Results
Less than $1,677,000 est. value
South Portland, ME 04106

Westbrook Street Shared Use Path – Phase II
Results
South Portland, ME 04106

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

York Street Mixed-Use Renovation
Renovation, Infrastructure - 9,620 SF
Construction
$5,000,000 CJ est. value
Portland, ME 04101

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Cummings Road Cannabis Cultivation Facility
New Construction, Infrastructure - 23,940 SF
Pending Verification
$2,500,000 CJ est. value
South Portland, ME 04106

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

St John Street Apartments
New Construction, Infrastructure - 10,726 SF
Design
$3,000,000 CJ est. value
Portland, ME 04102

Snow Plowing
Term Contract
Post-Bid
Gray, ME

Last Updated 04/24/2023 09:10 PM
Project Title

Pride's Corner Intersection Improvements Route 302 at Pride Street/Brook Street

Physical Address View project details and contacts
City, State (County) Westbrook, ME 04092   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $473,544 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: The installation of a new Traffic Control Signal and pedestrian signal equipment, construction of new ADA compliant sidewalk ramps, removal of existing pavement markings, and installation of new pavement markings and all other associated work as shown on the contract drawings and documents. The contractor shall make note of the schedule requirements presented in the contract documents. The contractor shall have 90 calendar days to complete the work. Final completion of the work shall be by June 30, 2024. The Issuing Office is the City of Westbrook City Hall, 2 York Street, Westbrook, ME 04092, ATTN: City Clerk's Office. Electronic (PDF) copies of the Contract Documents may be obtained by contacting Katherine Kelley at kkelley@westbrook.me.us or (207) 854-0660 ext. 3012. To be considered a responsive Bidder, the Contractor shall have obtained one set of plans and specifications electronically (PDF format) from the City. The Bid will not be awarded to the Bidder unless a record for obtaining documents from the City exists. A Pre-Bid Conference will not be held for this project. All questions shall be directed, in writing, to Katherine Kelley at kkelley@westbrook.me.us at least three (3) business days before the bid opening date. Questions received after this time will not be addressed. Responses from the City that substantially alter this RFP will be issued in the form of a written addendum to all those that have expressed interest in the project. Oral explanations or interpretations given before the award of contract will not be binding. A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. A completed Bid Form, Bid Security, Experience and Qualifications Statement with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid. Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents