Similar Projects
Rte 67;clizbe Ave and Widow Susan Rd Intersection Improvement
Infrastructure
Conception
$400,000 CJ est. value
Amsterdam, NY 12010

Canajoharie-route 10: Pm Paving; Rte 10
Infrastructure
Design
$460,000 CJ est. value
Canajoharie, NY 13317

Dollar General Distribution Center / Amsterdam
New Construction, Infrastructure - 750,000 SF
Design
$35,000,000 CJ est. value
Amsterdam, NY 12010

RFQ D/B - Town Hall and/or Highway Department Garage
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Fort Plain, NY 13339

Guy Park Manor Rehabilitation - Phase 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Yosts, NY 12068

Parks, Recreation and Historic Preservation
Infrastructure
Post-Bid
$1,276,500 CJ est. value
Fort Hunter, NY 12069

Fort Plain CSD Harry Hoag Elementary School - Generator Replacement
Alteration
Results
$300,000 est. value
Fort Plain, NY 13339

Palatine Bridge - West End Utility and Sidewalk Project
Infrastructure
Results
$945,799 CJ est. value
Palatine, NY 13339

Interfaith Partnership Homeless Shelter
Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Amsterdam, NY 12010

Amsterdam Free Library Renovation & Expansion - City of Amsterdam
Addition, Infrastructure, Renovation
Pending Verification
$1,800,000 CJ est. value
Amsterdam, NY 12010

PRESS - Multi Residential - MLB Construction
New Construction, Infrastructure
Design
Amsterdam, NY 12010

New Construction / Reconstruction High School Athletic Field Complex
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Saint Johnsville, NY 13452

Chuctanunda Creek Trail Extension
Infrastructure
Results
$496,134 CJ est. value
Amsterdam, NY 12010

Salt Storage - Town of Palatine
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Palatine, NY 13339

RFQ D/B - Town Hall and Safety Building Complex
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Amsterdam, NY 12010

Last Updated 04/06/2023 11:32 PM
Project Title

2023 Capital Improvement Project Contract No. 1 - General Construction

Physical Address View project details and contacts
City, State (County) Fonda, NY 12068   (Montgomery County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,699,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For 2023 Capital Improvement Project Contract No. 1 - General Construction The Fond-Fultonville Central School District, invites the submission of Sealed Bid Proposals to furnish materials and labor to complete the Fonda Fultonville Central School District 2023 Capital Improvement Project all in accordance with the plans and specifications. This work is to be bid under a MULTIPLE CONTRACT system covering the work of all trades under separate contracts as follows: Contract No. 1 - General Construction Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. PLANS AND SPECIFICATIONS REMAIN THE PROPERTY OF BCA Architects & Engineers AND MUST BE RETURNED IN GOOD CONDITION WITHIN THIRTY (30) BUSINESS DAYS AFTER AWARD OF CONTRACT OR REJECTION OF BIDS. The plan deposit for one set of Plans and Specifications will be refunded to bona fide bidders returning Plans and Specifications to REVplans within 30 business days after award of Contract or rejection of bids. A partial refund of the plan deposit, in an amount equal to the full amount of such deposit, less the actual cost of reproduction of the Plans and Specifications shall be made to non-bidders and unsuccessful bidders for the return of all other copies of the Plans and Specifications in good condition within 30 business days following the award of the Contract or the rejection of the bids. The Bid Documents and Contract Documents may also be examined at the office of BCA Architects & Engineers, 798 Cascadilla Street, Suite C, Ithaca, New York 14850. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General, Supplementary, and Special Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Each bidder must deposit with his bid, security in the form and subject to the conditions provided in the "INFORMATION FOR BIDDERS". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and to the minimum wage rates to be paid under the Contract. No bidder may withdraw his bid within 45 business days after the date of the opening of bids. Complete sets of Bidding Documents, Drawings and Specifications, may be obtained from REVplans, 28 Church Street; Suite 7, Warwick, New York 10990 Tel: 1-877-272-0216, upon depositing the sum of $100.00 for each combined set of documents. Checks or money orders shall be made payable to BCA Architects & Engineers. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Bidders wishing documents mailed to them shall include, in addition to the document deposit, a non-refundable check of $15.00 per set for handling and postage or a UPS/FedEx account number. There is no cost to the bidders for digital copies.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents