Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Deerpath Park Synthetic Turf Fields
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Curb and Gutter Installations
Infrastructure
Post-Bid
Lake Villa, IL

Seymour Alley Reconstruction
Infrastructure
Post-Bid
Mundelein, IL

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

Community Park Paving Improvements
Alteration
Post-Bid
Mundelein, IL 60060

Pulverization of The Existing Pavement and the Construction of Hot-Mix Asphalt Binder and Surface Courses
Results
Less than $137,064 est. value
Libertyville, IL

Soil Preparation at Grant Woods Forest Preserve
Infrastructure
Post-Bid
Ingleside, IL 60041

2021 Road Program
Infrastructure
Results
$1,350,000 est. value
Zion, IL

Shoreline Stabilization/Landscape Restoration
Infrastructure
Post-Bid
Mundelein, IL 60060

Joint Pavement Patching and Libertyville Public Alleys Resurfacing
Infrastructure
Results
Libertyville, IL

27th Street Resurfacing Phase III Engineering Services
Infrastructure
Post-Bid
Zion, IL

Last Updated 01/14/2023 12:31 AM
Project Title

Police Department Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Mundelein, IL 60060   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $585,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Summary is a listing of work to be completed. However, due to budgetary constraints the awarding authority reserves the right to reduce the scope of work to be completed under the contract in accordance with Article 104.02 of the Standard Specifications. No allowance will be made for delay or anticipated profits as the result of a decrease in the quantities of work to be performed or the reduction in asphalt thickness up to a half inch (1/2").

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents