Similar Projects
University of Oregon Retainer Program - Construction Services - Extended Period
Term Contract
Sub-Bidding
Eugene, OR 97403

Distribution Transformers
Term Contract
Sub-Bidding
Springfield, OR 97477

Pressure Washing at Washington Jefferson Park
Term Contract
Post-Bid
Eugene, OR 97402

On-Call Services for Minor Projects
Term Contract
Post-Bid
Eugene, OR 97401

Willow Planting and Blackberry Control
Term Contract, Alteration
Results
Eugene, OR

Traffic Control and Flagging Services for Utility Line Clearance Work
Term Contract
Results
Eugene, OR 97402

On-Call Repair and Maintenance Services Retainer Contract
Term Contract
Post-Bid
Eugene, OR 97401

Resilient Wedge & Butterfly Gate Valves
Term Contract
Results
Eugene, OR 97401

Bathymetric Survey Services at Cottage Grove Reservoir
Term Contract
Post-Bid
Cottage Grove, OR 97424

Conduit Install Springfield Library
Renovation
Results
$23,736 CJ est. value
Springfield, OR 97477

SSFP Re-sand Filter Bed - Slow Sand Filter Media
Term Contract
Post-Bid
Springfield, OR 97477

Debt Collection Services
Term Contract
Post-Bid
Eugene, OR 97401

Sand and Gravel
Term Contract
Post-Bid
Eugene, OR 97401

Utility Mechanical and Piping Systems Services
Term Contract
Post-Bid
Eugene, OR 97401

Natural Gas Pipeline Inspection Services
Term Contract
Post-Bid
Eugene, OR 97401

Last Updated 08/26/2023 03:33 AM
Project Title

Control House & Switchgear

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

EWEB wishes to procure a prefabricated control building for their replacement of Danebo Substation switchgear. This building will be fully integrated with medium-voltage metal clad switchgear and is to come equipped with full station service and substation protection. There will be only one point of contact for the entire Request for Proposal process. The contact point is the EWEB Purchasing Office, and the contact person is the Purchasing Contact listed above, unless otherwise stated. Any questions or issues that may arise regarding the specifications, the bidding process, and/or the award process shall be directed to the Purchasing Contactlisted above. EWEB's official response to any questions or requests will be in writing through direct letters or the Addendum process. RFP documents may be obtained by downloading the RFP documents from the State of Oregon's bid site. or navigation help, please call 1-855-800-5046.) All proposals shall be submitted as set forth in Section 1 - Instructions to Proposers. EWEB is not responsible for proposals submitted in any manner, format or to any delivery point other than as required by the Solicitation Document. No proposal may be withdrawn after the hour set for the opening thereof until the elapse of sixty (60) days from the date and time set for opening. EWEB reserves the right to waive any or all informalities and irregularities; may cancel the Request for Proposals; and may reject any or all proposals pursuant to EWEB Rule 3-0640. SCOPE OF WORK The Contractor shall design, manufacture, test, ship, offload, and reassemble (as required) a prefabricated building with integrated 15kV metal clad switchgear. The building will include elements solely designed by the Contractor.. Elements designed by others include: o Necessary ground/foundation work to support control house including conduits. Elements design by the Contractor include: o Building utility services per EWEB specifications o 15kV switchgear per EWEB specifications o Control integration with design by others The completed building shall be delivered to Danebo Substation and offloaded by the Contractor. The building will be reassembled and retested per EWEB and Contractor standards before being turned over to EWEB for final integration with Danebo Substation. Last day for EWEB to receive questions from Proposers August 29, 2023 Last day EWEB will post Addenda August 31, 2023 Closing date (last day to submit proposals to EWEB) September 6, 2023 Responses evaluated September 14, 2023 Intent to Award Announcement September 14, 2023 Optional to EWEB - Factory tour Board Approval October 3, 2023 Contract Award October 5, 2023 ANTICIPATED PROJECT SCHEDULE: Manufacturer Drawings December 2023 Factory Acceptance Testing July - August 2024 Delivery to Project Site September - October 2024

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents