Project Title | Control House & Switchgear |
Physical Address | View project details and contacts |
City, State (County) | Eugene, OR 97401 (Lane County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | EWEB wishes to procure a prefabricated control building for their replacement of Danebo Substation switchgear. This building will be fully integrated with medium-voltage metal clad switchgear and is to come equipped with full station service and substation protection. There will be only one point of contact for the entire Request for Proposal process. The contact point is the EWEB Purchasing Office, and the contact person is the Purchasing Contact listed above, unless otherwise stated. Any questions or issues that may arise regarding the specifications, the bidding process, and/or the award process shall be directed to the Purchasing Contactlisted above. EWEB's official response to any questions or requests will be in writing through direct letters or the Addendum process. RFP documents may be obtained by downloading the RFP documents from the State of Oregon's bid site. or navigation help, please call 1-855-800-5046.) All proposals shall be submitted as set forth in Section 1 - Instructions to Proposers. EWEB is not responsible for proposals submitted in any manner, format or to any delivery point other than as required by the Solicitation Document. No proposal may be withdrawn after the hour set for the opening thereof until the elapse of sixty (60) days from the date and time set for opening. EWEB reserves the right to waive any or all informalities and irregularities; may cancel the Request for Proposals; and may reject any or all proposals pursuant to EWEB Rule 3-0640. SCOPE OF WORK The Contractor shall design, manufacture, test, ship, offload, and reassemble (as required) a prefabricated building with integrated 15kV metal clad switchgear. The building will include elements solely designed by the Contractor.. Elements designed by others include: o Necessary ground/foundation work to support control house including conduits. Elements design by the Contractor include: o Building utility services per EWEB specifications o 15kV switchgear per EWEB specifications o Control integration with design by others The completed building shall be delivered to Danebo Substation and offloaded by the Contractor. The building will be reassembled and retested per EWEB and Contractor standards before being turned over to EWEB for final integration with Danebo Substation. Last day for EWEB to receive questions from Proposers August 29, 2023 Last day EWEB will post Addenda August 31, 2023 Closing date (last day to submit proposals to EWEB) September 6, 2023 Responses evaluated September 14, 2023 Intent to Award Announcement September 14, 2023 Optional to EWEB - Factory tour Board Approval October 3, 2023 Contract Award October 5, 2023 ANTICIPATED PROJECT SCHEDULE: Manufacturer Drawings December 2023 Factory Acceptance Testing July - August 2024 Delivery to Project Site September - October 2024 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |