Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Kettlestone Prairie
New Construction, Infrastructure - 3,500 SF
Design
$6,779,308 CJ est. value
Waukee, IA 50263

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

HMA Resurfacing With Milling
Infrastructure
Bidding
$1,500,000 CJ est. value
Woodward, IA 50276

East Street Stabilization Project
Infrastructure
Post-Bid
$120,000 est. value
Van Meter, IA 50261

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

NW Douglas Parkway Culvert and Pond Improvements
Infrastructure
Results
$3,000,000 est. value
Waukee, IA

Slope Protection
Infrastructure
Results
IA

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

Last Updated 11/22/2022 09:03 AM
Project Title

Southfork Drive Culvert Repairs

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $163,316 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

275323R SOLICITATION FOR QUOTATION FOR SOUTHFORK DRIVE CULVERT REPAIRS PROJECT, WAUKEE, IOWA The work to be done at the location shown on the plans includes construction of the Southfork Drive Culvert Repairs Project including all labor, materials and equipment necessary to construct approximately 164 square yards of pavement removal and replacement, culvert cutoff walls, traffic control and miscellaneous associated work, including cleanup. All work and materials are to be in accordance with the proposed plans, specifications, and form of contract now on file in the office of the City Clerk of Waukee, Iowa, and by this reference made a part thereof as though fully set out and incorporated herein. All quotations shall be submitted to the City Clerk of said City on or before the time herein set for receipt of quotations. All quotations shall be made on official documents furnished by the City, and any alterations in the official form of quotation will entitle the Council, at its option, to reject the quotation involved from consideration. Each quotation shall be sealed and plainly identified. The Contractor submitting the successful quotation will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The work will commence within ten (10) days after written Notice to Proceed and shall be completed by August 19, 2022. It is expected the City will accept a quotation or reject all quotations at the City Council meeting on March 21, 2022 at 5:30 P.M. As of September 14, 2022, no rebid information available It is expected the City will accept a quotation or reject all quotations at the City Council meeting on November 21, 2022 at 5:30 P.M

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents