Similar Projects
Centregreen Parking Garage
New Construction - 366,000 SF
Conception
$10,000,000 CJ est. value
Cary, NC

Weaver Dairy Mixed Use
New Construction, Demolition - 52,600 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chapel Hill, NC 27514

Carroll At The Avenue
New Construction - 1,133,700 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28405

Construction Manager at Risk - Downtown Parking Deck Project
Bidding
Hendersonville, NC 28792

S-1 Parking Deck and Central Generator Plant
New Construction - 15,000 SF
Sub-Bidding
Less than $65,000,000 est. value
Chapel Hill, NC

Eugene Street Parking Deck Construction Manager at Risk
Post-Bid
$20,000,000 est. value
Greensboro, NC

Design and Construction Services Forsyth County Courthouse Parking Structure
New Construction
Post-Bid
$11,000,000 est. value
Winston-Salem, NC

Civic Center Garage Restoration Work
Results
$274,000 est. value
Asheville, NC

Downtown Parking Improvements
Renovation
Results
Statesville, NC

Tryon Place
New Construction - 700,000 SF
Construction
$300,000,000 est. value
Charlotte, NC

45 Asheland
New Construction
Construction
Asheville, NC 28801

Wake Medical Office
New Construction - 133,890 SF
Design
$10,000,000 CJ est. value
Cary, NC 27518

CPCC Student Deck 1 Renovations 2019
Renovation
Post-Bid
Charlotte, NC 28204

McDowell Street Parking Deck Structural Repairs
Results
Charlotte, NC 28204

Pier 33
New Construction - 510,113 SF
Construction
$65,000,000 est. value
Wilmington, NC 28401

Reported 12/15/2018 12:00 AM
Project Title

WCU - North Baseball Parking Deck

Physical Address View project details and contacts
City, State (County) Cullowhee, NC   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description New 1,000 space parking structure located on the Main Campus in Cullowhee, North Carolina. The project will consist of the construction of three level cast-in-place concrete parking structure to replace the surface parking area located at Forest Hills Drive and Highway 107.
Details 1 Parking Garage, 3 Stories Above Grade, 300,000 SF New Construction 868 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents