Similar Projects
Seeking Restoration General Contractors for Exterior Restoration of the Tenant House Ayres/Knuth Farm
Renovation
Post-Bid
$289,024 est. value
Denville, NJ 07834

Historic Restoration General Contractors for Partial Interior Restoration/MEP Upgrades at the Ford-Faesch House
Renovation
Post-Bid
Wharton, NJ 07885

Phase II: Exterior Restoration of the Carriage House at Acorn Hall, Morristown
Renovation, Demolition
Post-Bid
Morristown, NJ 07960

Vannatta Farmstead Summer Kitchen Interior Restoration
Renovation
Post-Bid
Phillipsburg, NJ 08865

Jesse Allen Park Phase 3
New Construction
Bidding
Newark, NJ 07108

Professional Exhibit Improvements Plan for the Manasquan Reservoir Environmental Center
Renovation
Results
$80,350 est. value
Lincroft, NJ 07738

Carriage House Restoration and Rehabilitation
Renovation
Results
Paterson, NJ 07503

Rehabilitation and Addition to the Carriage House
Renovation
Results
$1,430,900 est. value
Caldwell, NJ 07006

Phase IC Exterior Restoration of the Seward House
Renovation
Post-Bid
Mount Olive, NJ 07828

Historic Restoration General Contractor for Phase IV: Partial Exterior Restoration Of The Merchants And Drovers Tavern
Renovation, Demolition
Post-Bid
Rahway, NJ 07065

Princeton University Art Museum
New Construction - 144,000 SF
Design
$10,000,000 CJ est. value
Princeton, NJ 08544

Restoration of the Ford-Faesch House - Phase V
Renovation
Post-Bid
Wharton, NJ 07885

Smith-Baldwin House Phase 3 Rehabilitation
Results
Parsippany, NJ 07054

Last Updated 06/29/2021 03:32 PM
Project Title

Craftsman Farms White Cottage Phase 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Morris Plains, NJ 07950   (Morris County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the project includes, but is not limited to the following: 1. Project supervision and administration of historic restoration projects. 2. Mold Remediation (Alternate No. 2) 3. Selective demolition 4. Stone masonry repair (Alternate No. 6) 5. Rough carpentry 6. Structural repairs 7. Exterior millwork 8. New basement bulkhead door (Alternate No. 3) 9. Asphalt shingle roofing 10.Flashing and roof drainage 11. Stucco repair (ALTENATE #5) 12. Painting (PARTIAL ALTERNATE #4) 13. Ventilation 14. Fire Alarm (ALTENATE #1)

Details

Museum, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents