Similar Projects
Old Center Elementary - Addition And Partial Renovation - 13BE0028 - Metropolitan Nashville Public Schools
Renovation, Addition
Design
$16,710,000 est. value
Goodlettsville, TN 37072

William R. Snodgrass Tennessee Tower Life Safety Upgrades
Renovation
Design
$400,000 CJ est. value
Nashville, TN 37243

Bottle Filling Stations
Renovation
Bidding
$55,000 CJ est. value
Nashville, TN 37219

FY21 MNPS IAQ Improvements Multiple Buildings
Renovation
Sub-Bidding
$200,000 CJ est. value
Nashville, TN 37219

HVAC Upgrades at Glencliff High School
Renovation
Sub-Bidding
$300,000 CJ est. value
Nashville, TN 37211

Vine Hill Apartments Heat Pump Replacement
Post-Bid
Nashville, TN 37204

Electrical, HVAC, Plumbing, Boiler, and Chiller Systems Maintenance and Repair
Term Contract
Post-Bid
$40,000,000 est. value
Nashville, TN

HVAC Replacement at Bellevue Middle School
Results
Nashville, TN 37221

HVAC Renovation at UNA Elementary
Results
Nashville, TN 37217

Meter Building HVAC Replacement
Alteration
Post-Bid
Nashville, TN 37222

Dupont Tyler Middle School HVAC
Results
Nashville, TN 37076

Clover Bottom Mansion Fan Coil Replacement
Alteration
Post-Bid
$798,600 est. value
Nashville, TN 37214

Kitchen Hood Replacement at Harris Hillman School
Alteration
Results
Nashville, TN 37212

TPW HVAC, Bas, and Smoke Evacuation Replacement
Alteration
Post-Bid
Nashville, TN

HVAC Equipment Replacement at Warner Elementary School
Alteration
Results
Nashville, TN 37206

Last Updated 08/09/2022 08:35 AM
Project Title

Glencliff Elementary School FY21 HVAC Renovations

Physical Address View project details and contacts
City, State (County) Nashville, TN 37211   (Davidson County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. 1. Allow for MNPS occupancy of site according to the Project Plan. 2. Keep driveways and entrances serving premises clear and available to MNPS, MNPS employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. HVAC Upgrades at Glencliff Elementary School

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents